

Planning drawings · London Borough of Ealing
Planning drawings in Ealing, £895 fixed
Ealing has no local validation list beyond the national one, but it returns incomplete applications after 28 days with a £45 charge, and six of its conservation areas carry Article 4 directions that reach down to windows and doors.
Householder application fee, paid to your council at submission.
Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).
Get this fee in writingor email hello@fixedfeeplans.co.uk
No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.
Ealing: £895 from Fixed Fee Plans, plus £548 to the council. Ealing Council granted 825 of 946 householder decisions (87.2%, prior approvals included) from 1 July 2025 to 30 June 2026, 14th highest of the 32 London boroughs with a stated rate and 1.4 points above London's 85.8%.
Ealing: 946 householder decisions
What is the householder approval rate in Ealing?
Ealing Council granted 825 of 946 householder decisions (87.2%) from 1 July 2025 to 30 June 2026, with larger home extension prior approvals counted in. That is 1.4 points above London's 85.8% (20,556 of 23,967), and 121 of its 946 decisions were not granted. Rank 14 counts the 32 boroughs with 50+ decisions (one has fewer). Source: MHCLG PS2. Compare all boroughs: London approval rates table.

What does Ealing Council need to validate an application?
- Ealing publishes no local list: national requirements plus a design and access statement where required and the CIL form. (source)
- Ealing aims to validate within 5–10 working days; if requested information is not supplied within 28 days the application is returned and a £45 administration fee charged. (source)
Article 4 directions in Ealing
five Article 4 directions below remove permitted development rights in Ealing. Check an address with the permitted development checker.
- Small HMOs. Perivale ward from 30 October 2024, and the rest of the borough (outside the OPDC area) from 14 November 2025: a change from house to small HMO needs planning permission. (source)
- Bedford Park. Removes rights for extensions, roof additions and alterations, porches, outbuildings, hard surfaces and antennae. (source)
- Brentham Garden Estate and Hanger Hill Garden Estate. Removes rights including replacement of windows and doors, roof materials, chimneys, porches, hardstandings and front boundaries. (source)
- Ealing Town Centre (The Grove). Removes rights for windows and doors, stonework, rendering and pointing, roofs, porches, hard surfaces and flues. (source)
- Hanger Hill (Haymills) Estate and Churchfields (Half Acre Road). Haymills: front elevation changes including windows, rooflights and front porches. Churchfields: roof additions and alterations. (source)
Ealing has 30 conservation areas. Its SPD 4 Residential Extensions remains in use as interim guidance. (source)

How long does a planning decision take in Ealing?
Ealing decided 424 householder applications from 1 July 2025 to 30 June 2026, prior approvals excluded; 407 of them (96%) took eight weeks or less.
- Ealing says most applications are decided within eight weeks. (source)
- A 30-minute householder planning appointment costs £311.40 including VAT, or £386.14 with written advice within 10 working days. (source)
Drawings and prices in Ealing
- fixed-fee planning drawings: £895.
- full plans drawings for building control: £795.
- check what an extension needs
Do I need planning permission? · Certificate of lawfulness from £950.
Neighbouring boroughs
Council facts checked 9 October 2026.
Answers
Ealing planning questions
What is Ealing Council's householder approval rate?
How long does Ealing take to decide a householder application?
What does Ealing Council ask for before it validates an application?
Which Article 4 directions apply in Ealing?
How much are planning drawings in Ealing?
Start with £150
Your fixed fee is already on this page.
Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.