Harrow asks for site sections with finished floor and site levels on every householder extension, and gives you 21 days to supply anything missing before the application is disposed of.
Householder application fee, paid to your council at submission.
Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).
Get this fee in writingor email hello@fixedfeeplans.co.uk
No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.
Harrow: £895 from Fixed Fee Plans, plus £548 to the council. Harrow Council granted 749 of 917 householder decisions (81.7%, prior approvals included) from 1 July 2025 to 30 June 2026, 26th highest of the 32 London boroughs with a stated rate and 4.1 points below London's 85.8%.
Harrow: 917 householder decisions
What is the householder approval rate in Harrow?
Harrow Council granted 749 of 917 householder decisions (81.7%) from 1 July 2025 to 30 June 2026, with larger home extension prior approvals counted in. That is 4.1 points below London's 85.8% (20,556 of 23,967), and 168 of its 917 decisions were not granted. Rank 26 counts the 32 boroughs with 50+ decisions (one has fewer). Source: MHCLG PS2. Compare all boroughs: London approval rates table.

What does Harrow Council need to validate an application?
- Existing and proposed floor plans and elevations, site sections, finished floor and site levels, and roof plans. (source)
- The application form plus the CIL PAAIR form; a detailed materials schedule in conservation areas or next to listed buildings. (source)
- Missing information must be supplied within 21 days or the application is disposed of. (source)
Article 4 directions in Harrow
two Article 4 directions below remove permitted development rights in Harrow. Check an address with the permitted development checker.
- Small HMOs, borough-wide (immediate direction). In force since 11 June 2026; the council must decide whether to confirm it by 11 December 2026. (source)
- Pinnerwood Park Estate Conservation Area. In the core area: all additions and alterations including replacement windows and doors, dormers and rooflights, porches, front and side hard surfaces and boundaries, and painting unpainted surfaces; outer areas: elevations facing a highway or open space. (source)
Harrow has 30 conservation areas. (source)

How long does a planning decision take in Harrow?
Harrow decided 695 householder applications from 1 July 2025 to 30 June 2026, prior approvals excluded; 657 of them (94.5%) took eight weeks or less.
- Householder pre-application advice is answered in writing within 15 working days. (source)
- Householder pre-app (Category J, 2026/27): £324.40 written only, or £530.80 with a meeting. (source)
Drawings and prices in Harrow
- our Harrow planning drawings team: £895.
- see what building control will check: £795.
- house extension plans
Do I need planning permission? · Certificate of lawfulness from £950.
Neighbouring councils
Council facts checked 10 October 2026.
Answers
Harrow planning questions
What is Harrow Council's householder approval rate?
How long does Harrow take to decide a householder application?
What does Harrow Council ask for before it validates an application?
Which Article 4 directions apply in Harrow?
How much are planning drawings in Harrow?
Start with £150
Your fixed fee is already on this page.
Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.