Free tool · no email required
Permitted development checker: do I need planning permission?
Check your permitted development rights in up to four questions. Plenty of London home improvements need no planning permission at all. Nobody else in this market volunteers that, because the application is the thing they are selling.
Up to four questions, one honest answer, and the fee for the route you actually need. If the answer is permitted development you will still need building regulations drawings, and an optional certificate of lawfulness from £795 is written proof if a buyer or lender asks.
Rules applied: Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 1, as amended. Conservation areas and Article 4 directions remove or restrict these rights. Listed buildings also need listed building consent. A checker cannot see your title or local designations — treat the result as a starting point, not a legal opinion.
Question 1 of up to 4
What type of property is it?
- Property
- Not answered yet
- Area
- Not answered yet
- Work
- Not answered yet
- Route
- Not answered yet
Fixed fee, in writing
Tell us about your project
Send the postcode and what you want to build, and add photos or old plans if you have them. We reply with the fee in writing and the payment stages set out in full.
Prices include one measured survey of a house of up to two storeys (£250). A flat or maisonette is £50 less; a house of three storeys or more is £50 more. One survey covers every service on the same job.


The detail
Permitted development limits for London houses
London has no rules of its own here: the same national limits apply, and what changes is the local designation. Flats have no permitted development rights for extensions, and listed buildings need listed building consent. These are the limits the quiz applies to a house.
| Work | Limit | Rule |
|---|---|---|
| Single-storey rear extension | Up to 3m past the original back wall, or 4m if detached. No higher than 4m. | Class A, A.1(f) |
| Larger rear extension | Up to 6m, or 8m if detached, through prior approval. Not in a conservation area or similar, or on a site of special scientific interest. | Class A, A.1(g) and A.4 |
| Two-storey rear extension | Up to 3m past the original back wall, at least 7m from the boundary behind it, and in practice 2m from the side boundaries. Not in a conservation area or similar. | Class A, A.1(h) |
| Side extension | Single storey, up to 4m high, and no wider than half the original house. Not in a conservation area or similar. | Class A, A.1(j) |
| Any Class A extension | Not forward of the front wall. Eaves no higher than 3m within 2m of a boundary. Half the land around the original house stays clear of buildings. | Class A, A.1(b), (e), (i) |
| Dormer or hip-to-gable loft | 40m³ added on a terrace, including end-of-terrace, 50m³ otherwise. No higher than the ridge, and nothing beyond the front roof slope facing a road. Not in a conservation area or similar. | Class B, B.1 |
| Rooflights | No more than 150mm proud of the roof, and no higher than its highest part. | Class C, C.1 |
| Garden room or outbuilding | Single storey, behind the front wall, for a use incidental to the house. Up to 4m with a dual-pitched roof or 3m otherwise, 2.5m within 2m of a boundary, eaves 2.5m. Not beside the house in a conservation area or similar. | Class E, E.1 and E.3 |
| House to small HMO | A family house to a house shared by three to six people, unless an Article 4 direction removes the right. | Part 3, Class L |
Source: General Permitted Development Order 2015, Schedule 2, Part 1, read 5 November 2026. "Original" means the house as first built, or as it stood on 1 July 1948. Conditions on an earlier permission can remove these rights, and houses created by certain changes of use, built under Part 20 or already enlarged upwards do not have them.
If the answer is permitted development, a certificate of lawfulness is optional written proof. For a larger rear extension, the prior approval route replaces a full application. The permitted development guide works through every limit project by project, the conservation area checker tells you from your postcode whether a conservation area or Article 4 area applies, and the price list sets out what each route costs.

Answers
Planning permission questions
Does a conservation area mean I always need planning permission?
Can a two-storey rear extension be permitted development?
Do I have to get a lawful development certificate?
What is an Article 4 direction?

The honest answer, even when it costs us work
If your project does not need an application, the checker says so.
Photo: Daniel Sikpi / Pexels
Start with £250
Your fixed fee is already on this page.
Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.