A rear extension under construction: new blockwork walls, a steel beam over the wide opening into the house, and bricks stacked on the ground
A bright kitchen with white cabinets, a stainless steel range cooker and extractor hood, and a window over the sink
Photo: Curtis Adams / Pexels

Planning + building regs + structural · London & home counties

Planning, building regs and structural, from £1,249

Planning drawings and submission, building regulations drawings and structural calculations for one extension or loft conversion, in one fee, compared with £2,185 or more bought separately.

Packagefrom £1,249
Separatelyfrom £2,185
Council fee£548
Stages5
Get your fixed feeFFP-01 · Rev A
Our fixed feefrom £1,249
Council fee, paid to your council£548
Our fee + council feefrom £1,797
CoverageAll 33 boroughs

Householder planning fee paid to your council at submission; the building control charge is separate and set by your council or a registered building control approver.

Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).

Get this fee in writing

or email hello@fixedfeeplans.co.uk

No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.

Starts at£150
Boroughs33/33
Stages5

Photo: Brett Jordan / Pexels

The planning, building regulations and structural package from Fixed Fee Plans costs from £1,249 for one extension or loft conversion, compared with £2,185 or more for the three services bought separately. It covers one measured survey, the planning drawings and submission, the building regulations drawings and the calculations for standard beams and lintels. Council fees are paid separately to the council or building control body.

Key points

  • from £1,249, published. £936 less than the three bought separately.
  • One survey, one model. The planning drawings, construction drawings and calculations all start from the same measurements.
  • Five stages. Paid stage by stage, never all up front.
  • Council fees separate. The £548 householder fee and the building control charge go to the authorities, not to us.
3D model

One model, three sets of drawings

Illustrative massing of a typical London terrace, not a real house. The extension is drawn 4.5m deep; a terraced house can add 3m at the rear without an application or prior approval, so at this depth it needs prior approval or planning permission (GPDO 2015, Schedule 2, Part 1, Class A).

How much does a planning and building regulations package cost in London?

The package costs from £1,249 with Fixed Fee Plans, the same in every London borough, compared with £2,185 or more for complete planning drawing service (£895), building regulations drawings (£795) and structural calculations (from £495) bought one at a time. It is “from” because the structure varies: standard beams and lintels are included, and anything beyond them is priced at the separate structural rate before it is done. The council's £548 householder planning fee and the building control charge are paid to them directly and are never folded into our price. Council planning fees are set by the Town and Country Planning (Fees for Applications) Regulations, annual indexation from 1 April 2026.

What is included in the package?

The package runs in five stages, each paid when it is delivered. The first three are the planning service; the last two are the construction side.

01
Measured surveyOne laser survey that serves the planning, building regulations and structural work
£150
02
Existing and proposed drawingsPlans, elevations and sections as built and as proposed, revised with you until right
£400
03
Planning application and submissionForms, statements, location and block plans, Planning Portal submission and officer queries
£200
04
Building regulations drawingsConstruction sections, details and specification notes, submitted to building control
£299
05
Structural calculationsBeam, lintel and padstone calculations for a standard extension or loft, checked by building control
£200
Total, package£1,249
What the package includes, against buying each service separately
ServiceBought separatelyIn the package
Complete planning drawing service£895£750
Building regulations drawings£795£299
Structural calculationsfrom £495£200
Total, our feefrom £2,185from £1,249
Difference£936 less as a package

Council fees are not in either column. Householder planning fee paid to your council at submission; the building control charge is separate and set by your council or a registered building control approver. The package covers one extension or loft conversion with standard beams and lintels; structural work beyond that is priced at the separate structural rate.

The back of a house extension at shell stage, with a large glazed opening, blockwork walls and a scaffold tower
An extension at shell stage: the opening, the blockwork and the beam above it are what the building regulations drawings describe. Photo: Brett Jordan / Pexels.

Why do planning and building regulations need separate drawings?

Planning and building regulations are separate approvals with separate tests, so each needs its own drawings. Planning decides whether the extension may be built, judged on its size, appearance and effect on the neighbours. Building regulations decide how it is built: structure, fire safety, insulation, ventilation and drainage, set out in Schedule 1 of the Building Regulations 2010. The approval comes from your council's building control or a registered building control approver (GOV.UK), and our building regulations drawings go to whichever you choose.

Building control routes

Where a problem is found: on paper, or on site

Full plans Recommended

  1. Drawings submitted
  2. Building control checks them
  3. Approval, conditions or rejection: a problem is found on paper
  4. Builder starts to approved drawings
  5. Site inspections, then completion certificate

Building notice Small, simple work

  1. Notice given; drawings are not formally approved, though building control can ask for them
  2. Work can start two days after the notice of starting is given
  3. Site inspections only, no formal decision
  4. A problem is found on site, possibly once it is built
  5. Rework, then completion certificate
Source: Building Regulations 2010, regulation 13 (building notice) and regulation 14 (full plans), and regulation 16 (two days between notice of starting and work). A building notice is not available for every kind of work, and the table above says which route suits what.

When do you need structural calculations?

You need structural calculations when the work changes how the house carries its load: a steel beam over a new opening into an extension, a wall taken out between two rooms, or new floor joists in a loft. Building control checks them against requirement A1 of the regulations, with Approved Document A as the guidance. In the package the engineer sizes the standard beams, lintels and padstones from our drawings; a more complex frame is priced at the structural calculations rate and quoted before it starts.

What is not included in the package?

Three costs sit outside the package, and none is ours to set. The council's planning fee, currently £548 for a householder application, is paid to the council when the application is submitted. The building control charge is set by your council or a registered building control approver and paid to them. If the work is to a shared wall, builds on the boundary, or digs near a neighbour's foundations, the Party Wall etc. Act 1996 may apply; our party wall service (from £695) is separate.

If the application goes through the Planning Portal, the Portal adds its own service charge: nothing, £99 or £149 including VAT, depending on the application type and complexity, paid to the Portal at submission and not normally refunded with a council fee (Ashford Borough Council, Planning Portal service charges, 11 September 2026). It is not ours and not the council's. Other submission routes exist; where your council accepts one without a charge, we can use it.

A bright kitchen with white cabinets, a stainless steel range cooker and extractor hood, and a window over the sink
A kitchen in a rear extension: the wide opening into it from the old house is carried by a beam. Photo: Curtis Adams / Pexels.

Who is the package for?

The package suits a homeowner with one extension or loft conversion that needs planning permission and building regulations approval, and who would rather have one fee and one set of drawings than three separate jobs. If your project may be permitted development, check first with the permitted development checker: if neither a planning application nor prior approval is needed, you do not need the planning part, and a certificate of lawfulness (from £950) can prove the work is lawful instead, and the building regulations drawings and structural calculations are from £1,095 together. If a single-storey rear extension qualifies for the larger home extension prior approval, the package covers that route at the same price, with a council fee of £249 instead of £548. More on rear and side extensions is on the house extension drawings page, and on lofts on the loft conversion drawings page.

Answers

Package questions

More in the planning guides.

How much is the planning and building regulations package?
from £1,249 for one extension or loft conversion, compared with £2,185 or more for the three services bought separately. Council fees are not included: the £548 householder planning fee is paid to your council at submission, and the building control charge is set by your council or a registered building control approver.
Why is it cheaper than buying the three separately?
One measured survey and one set of drawings serve all three, and the engineer works from our drawings instead of visiting to measure. The saving is the work that would otherwise be done twice.
Why is the price "from"?
Because structural work varies. The package covers standard beams and lintels for one extension or loft. Structure beyond that is priced at the separate structural calculations rate, which starts at £495, and quoted before any of it is done.
Do I need planning permission and building regulations approval?
They are separate approvals. Planning decides whether the extension or loft may be built at all; building regulations decide how it is built, from structure to fire safety and insulation. Many projects need both, but some need no planning application at all, and the permitted development checker tells you which.
Does the package cover prior approval instead of a planning application?
Yes. If a single-storey rear extension qualifies for the larger home extension prior approval, we prepare and submit that instead, at the same package price. The council fee is then £249 instead of £548, and the council has up to 42 days to decide (GPDO 2015, Schedule 2, Part 1, Class A). The larger home extension guide sets out the limits and the neighbour consultation.
What if my project needs neither planning permission nor prior approval?
Then you do not need the planning part, and we say so. The building regulations drawings and structural calculations are still needed: from £1,095 together as a building regs and structural package, against £795 and from £495 bought separately. A certificate of lawfulness (from £950) can prove the work is permitted development if you want that in writing.

Start with £150

Your fixed fee is already on this page.

Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.

01
Measured surveyWithin five working days
£150
02
Existing drawingsThe building as it stands
£200
03
Proposed drawingsYour scheme, revised until right
£250
04
Planning application packForms, statements, OS plans
£150
05
Submission and agent servicePortal submission, queries handled
£145
Total, planning application£895