Planning guides

Straight answers on planning permission, with the prices attached

Consumer bodies write the honest guides and never quote a price. Drawing firms quote a price and never write the honest guide. These do both, because someone deciding whether to extend needs the rule and the cost in the same place.

Guides12
Boroughs covered33
Sources namedAll
PaywallsNone
Get your fixed feeFFP-01 · Rev A
Our fixed fee£895
Council fee, paid to your council£548
Our fee + council fee£1,443
CoverageAll 33 boroughs

Householder application fee, paid to your council at submission.

Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).

Get this fee in writing

or email hello@fixedfeeplans.co.uk

No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.

Starts at£150
Boroughs33/33
Stages5

Photo: Huy Phan / Pexels

Blueprints and technical drawings on a desk
Cost

How Much Do Planning Drawings Cost? London Fixed Fees for 2026

Every fee on one page: our fixed fees, the council's fee shown separately, and each council's pre-application charge.

11 min readUpdated Oct 2026
Bright interior of a completed rear extension
Permitted development

Do I need planning permission? Permitted development rights explained

The GPDO rights that let you extend without an application, and the conservation area and Article 4 traps that remove them.

12 min readUpdated Sept 2026
Insulated extension under construction
Building regulations

Part L and the Future Homes Standard for London Extensions

The U-values and glazing limits an extension must meet, and what changes on 24 March 2027.

7 min readUpdated Oct 2026
Staircase leading up to a converted loft
Building regulations

Part B Fire Safety for Loft Conversions in Houses

Protected stairs, fire doors, alarms and escape windows, from Approved Document B.

7 min readUpdated Oct 2026
Structural steel beam in a house renovation
Building regulations

Part A Structure: When Do You Need Structural Calculations in London?

When a wall, opening or loft floor needs an engineer, and what building control checks.

8 min readUpdated Oct 2026
Single-storey rear extension
Prior approval

Larger Home Extension Prior Approval: 6m and 8m Rear Extensions

How the 6m and 8m rear extension route works, the 42-day clock and when neighbours can object.

8 min readUpdated Oct 2026
Converted loft with dormer
Permitted development

Loft Conversion Planning Permission and Permitted Development Rules

The 40m³ and 50m³ limits, dormers, hip-to-gable, and what counts towards the volume.

11 min readUpdated Oct 2026
Integral garage converted to a room
Garage conversions

Garage Conversion Planning Permission and Building Regulations

When converting a garage needs no application, what can change that, and the building regs that always apply.

8 min readUpdated Oct 2026
Shared house kitchen
HMOs

HMO Planning in London: Use Classes, Article 4 and Licensing

C3, C4 and sui generis, Class L, Article 4 directions and the licensing rules for houses in multiple occupation.

8 min readUpdated Oct 2026
House with completed rear extension
Certificates

Certificate of Lawfulness: Section 191, Section 192 and Immunity Periods

Section 191 vs 192, the evidence councils want, and the 10-year rule since April 2024.

7 min readUpdated Oct 2026
Shared wall between terraced houses
Party wall

Party Wall Act Notices: Sections 1, 2 and 6 Explained

The three triggers, the notice periods, surveyors, awards and who pays.

7 min readUpdated Oct 2026
White mews houses with blue doors on a London street
Cost

Planning Permission Fees in England: What You Pay, to Whom and When

The council fee for each type of application from 1 April 2026, what is refunded, and what is charged separately.

8 min readUpdated Oct 2026

Coming next

The building regulations cluster nobody else writes

Planning permission decides whether you may build it. Building regulations decide whether it is safe to build. The second half is where projects actually fail, and it is the half this market barely covers. From 24 March 2027 the Future Homes Standard brings new Approved Documents L and F into force in England.

L

Conservation of fuel and power

Fabric U-values, heat loss and the 2027 Future Homes Standard uplift — the part that most often sends a drawing set back.

B

Fire safety

Escape windows, protected stairs and the 30-minute separation every loft conversion needs, whether or not it needed planning permission.

A

Structure

Beams, padstones and the structural calculations building control wants before it will pass a steel over an opening.

MHCLG published the Future Homes Standard consultation response and new Approved Documents L and F on 24 March 2026, in force 24 March 2027 for standard work, with transitional arrangements to 24 March 2028.

Start with £150

Your fixed fee is already on this page.

Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.

01
Measured surveyWithin five working days
£150
02
Existing drawingsThe building as it stands
£200
03
Proposed drawingsYour scheme, revised until right
£250
04
Planning application packForms, statements, OS plans
£150
05
Submission and agent servicePortal submission, queries handled
£145
Total, planning application£895