A brick detached house beside a semi-detached pair with white weatherboarding and a single-storey side wing, in low evening sun
A brick detached house beside a semi-detached pair with white weatherboarding and a single-storey side wing, in low evening sun
Photo: angie duong / Pexels

Prior approval · London & home counties

Prior approval drawings, from £525

A measured survey, scaled plans and the written description your council needs to run the larger home extension process, with the neighbour addresses checked on site. One fixed fee, and the council's own fee shown apart.

Our feefrom £525
Survey inside£150
Council fee£249 to council

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Photo: angie duong / Pexels

Prior approval: larger home extension

from £525

from £375 drawings + £150 survey (£525 total)

Council fee £249 on top, paid to your council, never to us. A fixed fee, confirmed in writing before any work starts.

Get my fixed fee

What you get

  • A laser survey of the house, the garden and the boundaries, inside the fee
  • Existing and proposed floor plans and a rear elevation, drawn to scale
  • The written description the Order asks for: depth beyond the original rear wall, overall height and eaves height
  • A check of every earlier extension against the house as first built, so the depth you notify is the true total
  • The addresses of every adjoining owner and occupier, confirmed on the survey visit
  • A site plan showing the extension against the boundaries

Prior approval drawings for a larger home extension cost from £375 drawings + £150 survey (£525 total) at Fixed Fee Plans, and your council charges £249 on top. That buys the survey, the scaled plans and the written description the Order asks for, so your council can run its 42-day process on a 6m extension, or 8m on a detached house.

The route sits halfway between ordinary permitted development and a full householder application. You notify rather than apply, your neighbours get a say on one question only, and the paperwork is lighter than either. It still fails on a wrong depth or a missing address, and both come from measuring the house properly.

What does the fee cover, and what goes to the council?

Our fee covers the survey and the drawings; the council's fee goes to the council and is never part of ours. The split, to scale:

Cost breakdown: Drawings £375 paid to us; Measured survey £150 paid to us; Council fee £249 paid to your council£375£150£249Drawings, £375, paid to usMeasured survey, £150, paid to usCouncil fee, £249, paid to your councilFrom £774 in all, of which £525 is ours
Where the money goes, from our published prices and the council fee table. Prior approval fee, paid to your council.

The figure that trips people up is depth. Paragraph A.1(ja) of Class A counts any earlier extension that the new one joins, so a 3m kitchen extension from the 1990s plus a new 3m room is a 6m enlargement. On a semi-detached house that is the limit. We measure from the rear wall of the house as first built, and the description we write gives the total, which is what the council checks.

Which houses can use the larger home extension route?

Houses outside conservation areas and other article 2(3) land can use it, for a single-storey rear extension only. Flats and maisonettes cannot, and nor can a house whose rights were removed by an article 4 direction or a planning condition. If any of those apply, the route is a householder application instead.

Two London patterns come up often. Many inner boroughs are largely conservation area, so the route is closed for a whole street. And post-war semi-detached houses in the outer boroughs often already carry a rear extension, which uses up part of the 6m. Our permitted development checker answers the first question in a minute, and it will tell you plainly if your extension needs no notification at all.

A new single-storey rear extension at shell stage: blockwork walls, white bifold doors, a scaffold tower and a wheelbarrow on the slab
A single-storey rear extension at shell stage, the kind of build the larger home extension route covers. Photo: Brett Jordan / Pexels (Pexels License).

What happens once the council has the notification?

The council writes to the adjoining neighbours, waits at least 21 days for comments, and then has until day 42 to decide. If nobody objects, it only checks the extension against the Class A limits. If a neighbour objects, it also weighs the effect on the amenity of the adjoining homes, and nothing else.

How the prior approval: larger home extension service runs: 1. Survey; 2. Drawings and description; 3. Notification; 4. Neighbour notice; 5. Decision1SurveyWe measure the house, the garden andboth boundaries, and note any earlierextension against the original rearwall.2Drawings and descriptionScaled plans, the rear elevation and thewritten description of depth, height andeaves, checked against paragraph A.1.3NotificationYou send the pack and the £249 fee toyour council, which starts the 42-dayclock on receipt.4Neighbour noticeThe council writes to adjoining ownersand occupiers, who get at least 21 daysto comment.5DecisionThe council says prior approval is notrequired, grants it, or refuses it;silence after 42 days lets the build goahead.
How the prior approval: larger home extension service runs

Across London, the 33 planning authorities decided 4,547 larger home extension notifications in the year to June 2026, and 3,478 of them could go ahead (MHCLG live table PS1). Refusals vary widely by borough: Harrow refused 106 in that year and Camden one, which is why we read your council's recent decisions before drawing a proposal close to a boundary.

When is a householder application the better route?

When the extension is deeper than 6m (8m detached), taller than 4m, more than one storey, or on article 2(3) land, prior approval cannot cover it and a householder application is the route. Our complete planning drawing service is £645 drawings + £150 survey (£795 total), and the council's householder fee is £548.

Whichever route you take, building regulations approval is separate. The structure, insulation and drainage of a 6m extension go to building control on their own drawings, which are £545 drawings + £150 survey (£695 total) from us. A long rear extension usually needs a steel beam where the old rear wall opens up, sized by structural calculations. The larger home extension guide sets out every paragraph of Class A with its source.

Frequently asked questions

How long does larger home extension prior approval take?

Up to 42 days from the day the council receives a complete notification. If the council has not given its decision by then, the extension may go ahead under paragraph A.4(10). Our survey is usually booked within five working days.

Can my neighbour stop a 6m extension?

A neighbour cannot veto it. An objection makes the council assess the effect on the adjoining homes' amenity, and the council can refuse on that ground alone. Most London notifications in the year to June 2026 could go ahead, but the share varies by borough.

Do I need a certificate of lawfulness as well?

Not for the extension itself: the council's written decision, or the passing of 42 days, is the record. Some buyers' solicitors ask for more, and a certificate of lawfulness is from £545 drawings + £150 survey (£695 total) if you want one.

Can I start building before the 42 days are up?

Only if the council has already written to say prior approval is not required or is granted. Starting earlier, even with your neighbours' agreement, means building without the permission the route gives.

The figures, with their sources

Start with £150

Your fixed fee is already on this page.

Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.

01
Measured surveyWithin five working days
£150
02
Existing drawingsThe building as it stands
£175
03
Proposed drawingsYour scheme, revised until right
£225
04
Planning application packForms, statements, OS plans
£125
05
Submission and agent servicePortal submission, queries handled
£120
Total, planning application£795
Get a fixed quote from £525
Get my fixed fee