A person seen from above placing small white model buildings on a hand-drawn site plan, beside a case of compasses and pencils
A person seen from above placing small white model buildings on a hand-drawn site plan, beside a case of compasses and pencils
Photo: Ron Lach / Pexels

Feasibility options · London & home counties

Feasibility study for an extension, from £475

Several desktop massing options for your house, each tested against permitted development limits and your council's policy, with a plain note on which are worth drawing. You find out what is possible before you pay for a survey or an application.

Our feefrom £475
Council feeNone

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Photo: Ron Lach / Pexels

Feasibility and design options

from £475

from £475

No council fee for this service. A fixed fee, confirmed in writing before any work starts.

Get my fixed fee

What you get

  • Two or three massing options for your project, drawn in plan and shown as simple volumes
  • A check of each option against permitted development limits, so you can see which need no application
  • A policy note per option: your council's rules on depth, height, boundaries and character
  • Constraints that could change the answer, such as conservation area, listed status or an Article 4 direction
  • A plain verdict on which option to take forward and what to expect it to cost in council fees
  • Notes on what the next stage would need, so a survey and drawings can follow without re-briefing us

A feasibility study costs from £475 at Fixed Fee Plans. We test two or three massing options for your house against permitted development limits and your council's rules, and tell you which are worth drawing properly. No survey is needed for the study, so you can see what is possible before spending on one.

The question it answers is simple and expensive to get wrong: how much house can I add, and what will the council say? A feasibility study is a cheaper way to find out than a planning application and a refusal. It can also save you from an extension that the rules already allow without an application.

What can I build without planning permission?

Quite a lot, in many houses, and less than people think in conservation areas. A single-storey rear extension can project 3m from the original rear wall, or 4m on a detached house, under Class A of the General Permitted Development Order. With prior approval the larger home route allows 6m, or 8m on a detached house, outside article 2(3) land. A loft conversion can add 40 cubic metres to a terrace house or 50 to any other.

Those are limits, not entitlements. A council can remove them by an article 4 direction, and a house can have lost them earlier through a condition or an extension from a previous owner. Our desktop check looks for all of these. If a modest option needs no application at all, the study says so, even though an application would earn us more, and our permitted development checker runs the same test free.

How the feasibility and design options service runs: 1. Brief; 2. Desktop check; 3. Options; 4. Verdict; 5. Next step1BriefYou tell us what you want: anotherbedroom, a bigger kitchen, a loft room,and any budget limit.2Desktop checkWe read the maps and the council'spolicies for your address, withoutvisiting the site.3OptionsTwo or three massing options, eachmarked against the limits that apply toit.4VerdictA short written note: what each optioncan do, what it risks, and the one wewould pursue.5Next stepIf you proceed, a measured survey anddrawings follow, and the survey is addedonly then.
How the feasibility and design options service runs

What does a feasibility study show?

It shows volumes, not details. Each option is drawn as a simple massing on your plot: a rear extension at 3m, one at 6m under prior approval, a rear extension with a loft room above. Beside each, a table of what it needs: no application, prior approval, or a householder application, with the council's fee.

Timing matters too. A householder application that the council has not decided in 16 weeks earns a fee refund under regulation 9A of the Fees Regulations, unless you agreed a longer period, which tells you how long a consent can take and that a permitted option avoids it. Our note puts that next to the extra floor area each option gives, so you weigh square metres against time and fee, with the householder fee of £548 in the table.

Hands drawing along a ruler on a plan, with a sketchbook, a printed floor plan and a small white model on the desk
The sheets a householder application rests on, drawn at a desk from a measured survey. Photo: Tima Miroshnichenko / Pexels (Pexels License).

What is not in the study?

A survey and detailed drawings. The study works from public maps, your photographs and any plans you have, so its dimensions are estimates until we measure. If you go ahead, a measured survey is the next step, and the survey is added only then. Our complete planning drawing service is £645 drawings + £150 survey (£795 total).

Nor does the study promise a decision. It tells you where the council's published policies point and where a conservation officer may push back, and it says so when a scheme is a gamble. For a firmer read from the council itself, our pre-application request asks the officer, and a constraints report lists the designations on the address if you only need to know the ground rules.

Is a feasibility study worth it for a small project?

For a single-storey kitchen extension on an ordinary semi, usually not: the limits are well known and our checker is free. It earns its fee on awkward sites: a corner plot, a house with a prior extension, a conservation area, a loft in a terrace, a garden office near a boundary. In those, one wrong assumption costs more than the study.

It is also useful when two options are close. A 5m extension with a roof lantern may need an application, while a 3m extension with a bigger glazed link may not. Seeing both in volume, with the fee and time beside each, makes the choice a decision, not a guess.

Frequently asked questions

How much does a feasibility study cost?

Our fee is from £475, and it is a floor: a large plot or a project with several parts is quoted in writing first. A survey is added only if you go ahead.

Do I need a survey for a feasibility study?

No. The study is a desktop exercise, with dimensions taken from maps and your photographs. A survey comes later if you proceed.

Will the study tell me whether I need planning permission?

Yes, for each option. We mark which are permitted development, which need prior approval and which need a householder application. Where the answer depends on a council's discretion, we say that too.

What happens after the study?

You decide. You can take an option to a surveyor or builder of your choice, or ask us for the measured survey and drawings, and the survey is added to the price only then.

The figures, with their sources

Start with £150

Your fixed fee is already on this page.

Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.

01
Measured surveyWithin five working days
£150
02
Existing drawingsThe building as it stands
£175
03
Proposed drawingsYour scheme, revised until right
£225
04
Planning application packForms, statements, OS plans
£125
05
Submission and agent servicePortal submission, queries handled
£120
Total, planning application£795
Get a fixed quote from £475
Get my fixed fee