Two Victorian terraced houses on a London street, one painted white and one in yellow stock brick, with bay windows
Floor plan drawings, pencil sketches of a house, a scale rule and a protractor spread across a desk
Photo: Tima Miroshnichenko / Pexels

Planning drawings · London Borough of Hammersmith and Fulham

Planning drawings in Hammersmith and Fulham, £895 fixed

Hammersmith & Fulham has needed planning permission for basement development across the borough, apart from the Old Oak and Park Royal Development Corporation area, since 26 April 2018, and the council lists more than 40 further Article 4 directions that cover named addresses. Its 2018 Planning Guidance SPD says a rear extension will not normally be granted if it is longer than 3.5m, comes within 4m of the rear boundary or covers more than half the original rear open area. The council's validation checklist for householder applications is dated June 2017.

Our fee£895
Householder approval (incl. prior approvals)97.8%
Applications decided in 8 wks86.9%
Council fee£548
Get your fixed feeFFP-01 · Rev A
Our fixed fee£895
Council fee, paid to your council£548
Our fee + council fee£1,443
CoverageAll 33 boroughs

Householder application fee, paid to your council at submission.

Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).

Get this fee in writing

or email hello@fixedfeeplans.co.uk

No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.

Starts at£150
Boroughs33/33
Stages5

Photo: Huy Phan / Pexels

Hammersmith and Fulham: £895 from Fixed Fee Plans, plus £548 to the council. Hammersmith and Fulham Council granted 495 of 506 householder decisions (97.8%, prior approvals included) from 1 July 2025 to 30 June 2026, 1st highest of the 32 London boroughs with a stated rate and 12.0 points above London's 85.8%.

PS2 · at a glance

Hammersmith and Fulham: 506 householder decisions

Hammersmith and Fulham
Approvals, prior approvals included97.8%

495 of 506 granted. London: 85.8%.

Decided within 8 weeks86.9%

152 of 175 applications, prior approvals excluded.

Source: MHCLG PS2, 1 July 2025 to 30 June 2026. Dark tick: London.

What is the householder approval rate in Hammersmith and Fulham?

Hammersmith and Fulham Council granted 495 of 506 householder decisions (97.8%) from 1 July 2025 to 30 June 2026, with larger home extension prior approvals counted in. That is 12.0 points above London's 85.8% (20,556 of 23,967), and 11 of its 506 decisions were not granted. Rank 1 counts the 32 boroughs with 50+ decisions (one has fewer). Source: MHCLG PS2. Compare all boroughs: London approval rates table.

A long row of Victorian brick terraced houses with sash windows seen along the pavement
A Victorian terrace, the house type most planning drawings are drawn for. Photo: Peter Morch / Pexels.

What does Hammersmith and Fulham Council need to validate an application?

  • The council’s validation checklist for minor, householder and full applications, a file dated 21 June 2017, says any new basement, or lowering, enlarging or externally altering an existing one, needs a construction statement for basements with the application. (source)
  • Basement or ground-floor work in flood zone 2 or 3, or in a surface water flooding hotspot, needs a flood risk assessment covering tidal, groundwater, surface water and sewer flooding. (source)
  • Building work within five metres of the crown spread of any tree, including street trees and trees on neighbouring land, needs a tree survey. (source)
  • A design and access statement is needed when a householder proposal affects a listed building or a conservation area. (source)

Article 4 directions in Hammersmith and Fulham

two Article 4 directions below remove permitted development rights in Hammersmith and Fulham. Check an address with the permitted development checker.

  • Basements, borough-wide (2018). Since 26 April 2018 basement development needs planning permission across the borough, apart from the Old Oak and Park Royal Development Corporation area. (source)
  • Street-by-street directions in conservation areas. The council lists more than 40 further directions, each covering named addresses and particular works. In Bradmore (1), for example, any structure at ground or first-floor level behind the rear wall needs permission; in Brook Green (1), any change to the front roof or gable. (source)

Hammersmith & Fulham has designated 44 conservation areas. (source)

A London mews of white-painted two-storey houses with garage doors and external stairs along a cobbled street
A London mews. Photo: AXP Photography / Pexels.

How long does a planning decision take in Hammersmith and Fulham?

Hammersmith and Fulham decided 175 householder applications from 1 July 2025 to 30 June 2026, prior approvals excluded; 152 of them (86.9%) took eight weeks or less.

  • Householder pre-application advice (2026/27) costs £452 for written advice, which the council aims to give within 10 working days, or £654 for a meeting (£1,370 where a basement or listed building is involved), with a response aimed for within 20 working days. (source)

Design guidance: Planning Guidance SPD (February 2018). Adopted 28 February 2018, it says a rear extension will not normally be granted if it projects more than 3.5 metres, comes within 4 metres of the rear boundary, or covers more than half the open area at the rear of the original property.

Drawings and prices in Hammersmith and Fulham

Do I need planning permission? · Certificate of lawfulness from £950.

Neighbouring boroughs

Council facts checked 14 October 2026.

Answers

Hammersmith and Fulham planning questions

What is Hammersmith and Fulham Council's householder approval rate?
Hammersmith and Fulham Council granted 495 of 506 householder decisions (97.8%, prior approvals included) from 1 July 2025 to 30 June 2026, 1st highest of the 32 London boroughs with a stated rate and 12.0 points above London's 85.8%. Source: MHCLG live table PS2.
How long does Hammersmith and Fulham take to decide a householder application?
Hammersmith and Fulham decided 175 householder applications from 1 July 2025 to 30 June 2026, prior approvals excluded; 152 of them (86.9%) took eight weeks or less. (MHCLG live table PS2) Householder pre-application advice (2026/27) costs £452 for written advice, which the council aims to give within 10 working days, or £654 for a meeting (£1,370 where a basement or listed building is involved), with a response aimed for within 20 working days. (lbhf.gov.uk)
What does Hammersmith and Fulham Council ask for before it validates an application?
The council’s validation checklist for minor, householder and full applications, a file dated 21 June 2017, says any new basement, or lowering, enlarging or externally altering an existing one, needs a construction statement for basements with the application. Basement or ground-floor work in flood zone 2 or 3, or in a surface water flooding hotspot, needs a flood risk assessment covering tidal, groundwater, surface water and sewer flooding. (lbhf.gov.uk)
Which Article 4 directions apply in Hammersmith and Fulham?
Hammersmith and Fulham Council lists two Article 4 directions: Basements, borough-wide (2018); Street-by-street directions in conservation areas. Hammersmith & Fulham has designated 44 conservation areas. (lbhf.gov.uk)
How much are planning drawings in Hammersmith and Fulham?
£895 fixed, plus Hammersmith and Fulham's £548 fee. See the price list.

Start with £150

Your fixed fee is already on this page.

Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.

01
Measured surveyWithin five working days
£150
02
Existing drawingsThe building as it stands
£200
03
Proposed drawingsYour scheme, revised until right
£250
04
Planning application packForms, statements, OS plans
£150
05
Submission and agent servicePortal submission, queries handled
£145
Total, planning application£895