The drawings a London basement conversion needs, split by the two jobs people mean: turning an existing cellar into rooms, or digging a new or deeper basement. Borough basement policies, the impact assessment, structure, flooding and building regulations.

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Photo: Karola G / Pexels

The drawings you need for a basement conversion in London depend on one line in the Town and Country Planning Act 1990. Interior works are not development, but section 55(2)(a) excludes works "for the alteration of a building by providing additional space in it underground" (section 55). So fitting out a cellar you already have needs building regulations drawings only. Digging a new basement, or lowering a floor to make one, needs planning drawings as well, tested in inner London against a borough basement policy.

On this page
The job Planning Drawings you need Our fee
Fit out an existing cellar, no digging, outside unchanged Not development Building regulations set: escape, waterproofing, ventilation, insulation Building regulations drawings £795; the engineer's design is separate
Lower the cellar floor to gain a storey, or add a lightwell Development: a planning application Planning set, then a building regulations set Basement planning drawings from £1,955, then building regulations
Dig a new or extended basement Planning application against the borough's basement policy Planning set with garden areas and soil depths, specialist reports, then building regulations from £1,955 for planning; reports by others

The basement drawings are priced on their own: no package of ours includes them. The council's householder fee of £548 is paid to the council.

Is my project a cellar conversion or a new basement?

A project is a cellar conversion only if it uses space that is already underground and leaves the outside unchanged; anything that digs new space is a basement for planning purposes. Fitting out an existing cellar needs building regulations drawings only, while lowering the floor, adding a lightwell or digging a new basement normally needs a planning application.

  1. Fitting out an existing cellar, inside only. No planning drawings. Building regulations still apply, because the cellar becomes habitable rooms.
  2. Lowering the floor or adding a lightwell. Digging out to gain a habitable storey provides space underground that was not there, which takes it outside the section 55 exemption. A new front or rear lightwell also changes the outside. Ask the council, or apply for a certificate of lawfulness from £795, if you think a small dig falls short of that.
  3. A new or extended basement. A planning application, judged against your borough's basement policy.

A listed house is different again: Kensington and Chelsea's Policy CD11 rules out any excavation under a listed building, including its vaults, and the work also needs listed building consent, priced separately.

Step by step: 1. Classify; 2. Survey; 3. Test; 4. Draw; 5. Submit1ClassifyCellar conversion, lowered floor or newbasement: the route follows.2SurveyHouse, cellar, gardens and levelsmeasured.3TestSize checked against your borough'sbasement policy before drawing.4DrawPlans and sections, coordinated with thespecialists' reports.5SubmitPlanning first where needed, thenbuilding control.
Step by step

What do London borough basement policies require?

London borough basement policies cap how much of the garden a basement may sit under, how deep it may go and how much soil must cover it. Kensington and Chelsea's plan records why: basement applications there rose from 46 in 2001 to 450 in 2013 (RBKC Local Plan 2024, paragraph 6.91). The three central boroughs' numbers are close but not the same:

Borough Size limit Other tests
Kensington and Chelsea (CD11) 50% of each garden, one storey 1m of soil over any part under a garden; no digging under a listed building; pumped device against sewer flooding
Westminster (Policy 50) Half the garden, one storey 1m of soil plus a 200mm drainage layer over the top
Camden (A5) Half of each garden, less than 1.5 times the house footprint, one storey Impact assessment showing neighbours' damage risk no worse than Burland category 1

Sources: RBKC Local Plan 2024 (above), Westminster City Plan 2019-2040, Camden Local Plan 2017.

Hammersmith and Fulham, Wandsworth, Islington, Richmond and Lambeth have their own policies too, each measuring the limit a different way; Islington, for instance, caps a residential basement at 3 m floor to ceiling. Our borough pages set them out in full: Camden, Kensington and Chelsea, Westminster, Wandsworth, Islington and Lambeth. Where a borough has no basement policy, the council tests a basement against its local plan's general design and amenity policies.

The survey therefore matters more for a basement than for an extension. The garden is measured the way the policy measures it, and the area left untouched is dimensioned on the plan, before a section is drawn.

For example (illustrative, not a real job), consider a Camden terrace house with a 5 m by 10 m footprint and a 12 m garden. Policy A5's 1.5 times rule caps the basement below 75 m², and the half-depth rule stops it 5 m into the garden, inside the half-the-garden rule's 6 m. At 5 m the area reaches 75 m², so the plan stops just short.

What drawings do I need for a basement planning application in London?

A planning application for a basement in London needs five drawings, each measured to the borough's policy:

  • Existing and proposed plans of the basement, ground floor and garden.
  • Sections through the house, the basement and the garden, with the soil depth over the top and existing and proposed levels tied to a fixed datum.
  • Existing and proposed elevations showing any lightwells, railings, grilles and rooflights in the garden.
  • Location and block plans.
  • A plan of the garden areas and the house footprint, with the percentages your borough's policy tests.

The council will also expect reports the drawings must match. A basement impact assessment is a specialist report on how the dig affects ground stability, groundwater and surface water, and Camden asks for one with every basement application. In Kensington and Chelsea it is a flood risk assessment for every basement, as our post on flood risk assessments for basements explains; our basement flood risk assessment is from £570, separate from the drawings. The impact assessment and any construction method statement are by engineers and hydrogeologists. We give each specialist the same survey and sections so the reports and drawings agree.

An inspector in a yellow hard hat and high-visibility vest holding a clipboard and looking up at the ceiling of an empty, freshly decorated room
Building control inspects the work on site against the drawings it approved. Credit: RDNE Stock project / Pexels (Pexels License). View full-size image (new tab).

What do building regulations need?

Building regulations need the same set for a cellar conversion and a new basement. Our building regulations drawings are £795. They show six things.

  • Escape. Basement storeys containing habitable rooms need an emergency escape window or external door, or a protected stairway to a final exit (Approved Document B, Volume 1, paragraph 2.16). Under a terrace, that means either a lightwell with an escape window, which has planning consequences, or an enclosed stair, which changes the ground-floor layout.
  • Waterproofing. The section shows the waterproofing system, designed by the specialist to BS 8102, and the sump and pumps.
  • Sewer flooding. A pumped device or non-return protection on the drainage. Camden and Kensington and Chelsea require a positive pumped device (Camden Basements CPG).
  • Ventilation and light. Extract and background ventilation for each room, and daylight where the lightwell allows.
  • Insulation. Walls and floor brought up to Part L for the new habitable space.
  • Structure. Underpinning and retaining walls come from a basement engineer's design, priced by them; beams over new openings can be our structural calculations from £425.

What about the neighbours?

The neighbours come in through the Party Wall etc. Act 1996 whenever the dig goes near their foundations. Excavating within 3 m of a neighbour's building to below the bottom of its foundations needs a notice under section 6 of the Act, served at least one month before the dig. Underpinning the wall itself is work under section 2. We refer party wall notices to a specialist; our Party Wall Act guide explains the timings. Allow for them before you book the contractor.

The planning application asks for related evidence. Camden's impact assessment, for example, has to show that the risk of damage to neighbouring buildings is no worse than Burland category 1, which is very slight cracking. The engineer works that out from the sections we draw, so the depth of the dig and the position of every party wall are shown accurately.

Work out your fee

FFP-01 · Rev A
Our fixed feefrom £1,955
Council fee, paid to your council£548
Our fee + council feefrom £2,503
CoverageAll 33 boroughs

Householder application fee, paid to your council; basement impact and structural reports are by others.

Prices include one measured survey of a house of up to two storeys (£250). A flat or maisonette is £50 less; a house of three storeys or more is £50 more. One survey covers every service on the same job.

Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).

Get this fee in writing

or email hello@fixedfeeplans.co.uk

No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.

Starts at£250
Boroughs33/33
Stages5

Frequently asked questions

Do I need planning permission to convert my cellar? Not if the work is internal, adds no space underground and leaves the outside unchanged. Lowering the floor to make a new storey, or adding a lightwell, changes the answer, so settle the scope before the drawings start.

How much headroom does a basement room need? The building regulations set no minimum ceiling height for a habitable room, but a stair needs 2 m of headroom under Approved Document K. Borough policies cap the height instead: Islington allows a residential basement no more than 3 m floor to ceiling (Islington Local Plan 2023, Policy DH4).

Can I have a bedroom in a basement? Building regulations allow it with the right escape route. Planning is a separate question in a flood zone, where the council reads the basement flood risk assessment before it accepts sleeping space below ground, so check the flood zone first.

Is the basement impact assessment included in your fee? No. Engineers and hydrogeologists prepare it, from the survey and drawings we supply. Which specialists you need depends on the borough's validation list for basements.

If the application goes through the Planning Portal, the Portal adds its own service charge: nothing, £99 or £149 including VAT, depending on the application type and complexity, paid to the Portal at submission and not normally refunded with a council fee (Ashford Borough Council, Planning Portal service charges, 11 September 2026). It is not ours and not the council's. Other submission routes exist; where your council accepts one without a charge, we can use it.

Two rusty steel I-beams lying on gravel with paper labels attached

Fixed fee, in writing

Basement planning drawings: from £1,705 drawings + £250 survey (£1,955 total)

The fee is published and confirmed in writing before any work starts. Council fees are passed through at cost, never marked up.

Get my fixed fee

Photo: W.carter / Wikimedia Commons, CC0

Floor plan drawings, pencil sketches of a house, a scale rule and a protractor spread across a desk
Photo: Tima Miroshnichenko / Pexels

The figures, with their sources

Basement planning drawings: the fee, fixed

from £1,955

from £1,705 drawings + £250 survey (£1,955 total)

Council fee £548 on top, paid to your council, never to us. A fixed fee, confirmed in writing before any work starts.

Prices include one measured survey of a house of up to two storeys (£250). A flat or maisonette is £50 less; a house of three storeys or more is £50 more. One survey covers every service on the same job.

Get my fixed fee

What you get

  • A measured survey of the house, the cellar and the gardens
  • Existing and proposed plans of every floor the basement affects
  • Sections through the basement, lightwells and garden with levels
  • Garden and footprint areas measured against your borough's basement policy
  • Drawings coordinated with the engineer's and the impact assessor's reports

Ask for your fixed fee

Send the postcode and a line about the project. Photos or old plans help, and the fee comes back in writing.

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Two hands holding a printed floor plan over a desk of drawings, with a pen and notebook beside it
Photo: Tima Miroshnichenko / Pexels

Keep reading

Related posts and guides

An empty cellar with block walls, a concrete floor, exposed timber joists overhead and a timber stair rising on the right
Statementsfrom £570

Do I Need a Flood Risk Assessment for a Basement in London?

Why London councils treat basements differently from extensions: Kensington and Chelsea's assessment for every basement, Camden's sewer flooding rule, Wandsworth's breach hazard table, and what a basement flood risk assessment covers.

7 min readUpdated November 2026
An inspector in a yellow hard hat and high-visibility vest holding a clipboard and looking up at the ceiling of an empty, freshly decorated room
Building regulations£795

Building Control Drawings in London: What Does an Extension Need?

When an extension in London must go in as full plans (regulation 12(5) and a sewer within the work), what the full plans set shows sheet by sheet, the Part L, B and F figures checked, and when a building notice will do.

7 min readUpdated November 2026
Two rusty steel I-beams lying on gravel with paper labels attached
Building regulationsfrom £425

What Drawings Do I Need to Remove a Load-Bearing Wall in London?

The drawings, calculations and notices a London knock-through needs: building regulations rather than planning, what building control checks, the fire question an open-plan ground floor raises, party walls, flats and listed houses.

5 min readPublished November 2026
Guide · Building regulations

Part A Structure: When Do You Need Structural Calculations in London?

When a wall, opening or loft floor needs an engineer, and what building control checks.

8 min read
Guide · Party wall

Party Wall Act Notices: Sections 1, 2 and 6 Explained

The three triggers, the notice periods, surveyors, awards and who pays.

7 min read
Guide · Permitted development

Do I need planning permission? Permitted development rights explained

The GPDO rights that let you extend without an application, and the conservation area and Article 4 traps that remove them.

12 min read
Get a fixed quote from £1,955
Get my fixed fee