A long terrace of brown brick houses above a white stuccoed ground floor on Ponsonby Place in Westminster, with iron railings and no-entry signs
Floor plan drawings, pencil sketches of a house, a scale rule and a protractor spread across a desk
Photo: Tima Miroshnichenko / Pexels

Basement planning drawings · London Borough of Westminster

Basement planning drawings in Westminster, from £1,855 fixed

Westminster's Policy 50 holds a basement to half the garden, or 4m from the house where the garden is 8m or less, and to one storey of about 2.7m. It needs a metre of soil plus a 200mm drainage layer over the top, and limits vaults under the pavement to 1.8m.

Basementfrom £1,705 drawings + £150 survey (£1,855 total)
Council fee£548
Get your fixed feeFFP-01 · Rev A
Our fixed fee£795
Council fee, paid to your council£548
Our fee + council fee£1,343
CoverageAll 33 boroughs

Householder application fee, paid to your council at submission.

Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).

Get this fee in writing

or email hello@fixedfeeplans.co.uk

No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.

Starts at£150
Boroughs33/33
Stages5

Photo: PAUL FARMER / Wikimedia Commons, CC BY-SA 2.0

Fixed fee, in writing

Tell us about your project

Send the postcode and what you want to build, and add photos or old plans if you have them. We reply with the fee in writing and the payment stages set out in full.

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Two Victorian terraced houses on a London street, one painted white and one in yellow stock brick, with bay windows
A London terrace. Photo: Huy Phan / Pexels.

What Westminster Council asks of a basement

From the council's City Plan 2019-2040, Policy 50 (Basement developments) (adopted adopted January 2026).

  • Policy 50 supports basements that do not extend beneath more than 50% of the garden land; on small sites where the garden is 8m or less at its longest point, a basement may extend up to 4m from the original building in that direction. (source, checked 26 October 2026)
  • A basement should leave a margin of undeveloped garden land around the entire site boundary and comprise no more than one storey beneath the lowest original floor level, with exceptions on large sites with good access for construction. (source, checked 26 October 2026)
  • Policy 50 asks for a minimum of one metre of soil depth plus a minimum 200mm drainage layer above the top of the basement, and the supporting text says up to 1.5m may be needed to support tree growth. (source, checked 26 October 2026)
  • A basement must not encroach more than 1.8m under any part of the adjacent highway and must keep at least 900mm between the highway surface and the vault structure. (source, checked 26 October 2026)
  • Applications should include a structural methodology statement with self-certification by a suitably qualified engineer and a signed Appendix A pro forma of the Code of Construction Practice; the plan puts one storey at approximately 2.7m floor to ceiling. (source, checked 26 October 2026)

What Westminster basement drawings have to show

A Westminster set measures the garden as site area less the original footprint, then shows the basement against 50 per cent of it, or against the 4m line where the garden is 8m or shorter. The margin of undeveloped land is drawn around the whole boundary, not just at the back.

Sections show one storey of about 2.7m below the original floor, and the metre of soil with its 200mm drainage layer on top. Where vaults run under the pavement we dimension how far they reach and the 900mm of cover above them, so the engineer's structural methodology statement and the drawings agree.

PS2 · at a glance

Westminster: 366 householder decisions

Westminster
Approvals, prior approvals included82%

300 of 366 granted. London: 85.8%.

Decided within 8 weeks66.1%

123 of 186 applications, prior approvals excluded.

Source: MHCLG PS2, 1 July 2025 to 30 June 2026. Dark tick: London.
Two hands holding a printed floor plan over a desk of drawings, with a pen and notebook beside it
Checking the drawings with you before anything goes to the council. Photo: Tima Miroshnichenko / Pexels.

What it costs in Westminster

  • Basement planning drawings: from £1,705 drawings + £150 survey (£1,855 total), plus £548 to Westminster Council.
  • Householder application fee, paid to your council; basement impact and structural reports are by others.

Basement planning drawings across London · Westminster planning rules · every price

Answers

Westminster basement questions

How far can a basement extend under a small garden in Westminster?
Up to 4m from the original building, where the garden is 8m or less at its longest point. On larger gardens Policy 50 of the City Plan allows a basement under no more than 50 per cent of the garden land, and in both cases a margin of undeveloped garden must be left around the entire site boundary.
How much soil does Westminster want over a basement?
At least one metre of soil plus a drainage layer of at least 200mm, with enough overall soil volume above the top of the basement for planting. The City Plan adds that up to 1.5m, plus the drainage layer, may be required where trees need to grow, and asks applicants for details of the soil profile.
What reports does a Westminster basement application need?
A structural methodology statement with self-certification from a suitably qualified engineer, and a signed Appendix A pro forma from the Code of Construction Practice. A flood risk assessment and structural statement are also needed in flood zones 2 or 3 or a surface water hotspot, and the council encourages you to consult neighbours first.

Start with £150

Your fixed fee is already on this page.

Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.

01
Measured surveyWithin five working days
£150
02
Existing drawingsThe building as it stands
£175
03
Proposed drawingsYour scheme, revised until right
£225
04
Planning application packForms, statements, OS plans
£125
05
Submission and agent servicePortal submission, queries handled
£120
Total, planning application£795