Two Victorian terraced houses on a London street, one painted white and one in yellow stock brick, with bay windows
Floor plan drawings, pencil sketches of a house, a scale rule and a protractor spread across a desk
Photo: Tima Miroshnichenko / Pexels

Planning drawings · Slough Borough Council

Planning drawings in Slough, £895 fixed

Slough's local validation list was formally adopted on 1 January 2026, and an invalid application has four weeks to be put right before it is returned. In the Green Belt the elevations must come with original, existing and proposed volumes, original meaning the house as it stood on 1 July 1948 or as first built, and trees over 75mm in diameter within influencing distance of the work call for a BS 5837 tree survey. The only Article 4 direction we found is a borough-wide one approved on 5 March 1952 that covers caravans and moveable structures, not house extensions; we found none removing householder rights, but conditions on an earlier permission and the five conservation areas still matter, so we check your address before we design.

Our fee£895
Householder approval (incl. prior approvals)81%
Applications decided in 8 wks72.4%
Council fee£548
Get your fixed feeFFP-01 · Rev A
Our fixed fee£895
Council fee, paid to your council£548
Our fee + council fee£1,443
CoverageAll 33 boroughs

Householder application fee, paid to your council at submission.

Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).

Get this fee in writing

or email hello@fixedfeeplans.co.uk

No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.

Starts at£150
Boroughs33/33
Stages5

Photo: Huy Phan / Pexels

Planning permission drawings in Slough from Fixed Fee Plans cost £895, survey to submission. Slough Borough Council granted 328 of 405 householder decisions (81%) from 1 July 2025 to 30 June 2026, counting householder planning applications and larger home extension prior approvals together. The council's own fee of £548 is paid to the council.

What is the householder approval rate in Slough?

Slough Borough Council granted 328 of 405 householder decisions (81%) from 1 July 2025 to 30 June 2026, counting householder planning applications and larger home extension prior approvals together. Across London the same measure was 85.8% (20,556 of 23,967). Source: MHCLG live table PS2, district planning application statistics, 1 July 2025 to 30 June 2026. See the other Berkshire councils on the Berkshire planning page.

Slough at a glance, householder applications
  • Slough: granted81% 328 of 405 granted
  • London: granted85.8% 20,556 of 23,967 granted
  • Slough: decided in 8 weeks72.4% 189 of 261 within 8 weeks
  • London: decided in 8 weeks93.4% 15,451 of 16,549 within 8 weeks

Granted includes larger home extension prior approvals; decided in 8 weeks excludes them. Source: MHCLG live table PS2, district planning application statistics, 1 July 2025 to 30 June 2026.

The tiled roofs and upper floors of brick semi-detached houses in Canterbury, England, with trees behind
Semi-detached houses in Canterbury, England. Photo: angie duong / Pexels.

What does Slough Borough Council need to validate an application?

  • The council's local validation list was formally adopted on 1 January 2026; an invalid application is given 4 weeks to be made valid and is then returned. (source)
  • A block plan (recommended 1:100, 1:200 or 1:500) showing trees on the site and on adjacent land, and the extent and type of any hard surfacing with its drainage. (source)
  • Cross sections, showing window positions and head heights, for a loft extension or where ground levels change. (source)
  • In the Green Belt, the elevations must come with original, existing and proposed volume calculations, original meaning the house as it stood on 1 July 1948 or as first built. (source)
  • A BS 5837 tree survey with impact assessment, method statement and tree protection plan for trees over 75mm in diameter within influencing distance of the work, on the site or next to it. (source)
  • Site and finished floor levels in Flood Zones 2 or 3, on land that is not reasonably level, and for basements or swimming pools. (source)

Article 4 directions in Slough

An Article 4 direction removes permitted development rights, so work that needs no application elsewhere needs one here. Check yours with the permitted development checker.

  • Caravans and moveable structures, whole borough. A direction approved on 5 March 1952 removes the right to station a caravan or moveable structure on land for up to 28 days a year anywhere in the borough. The council notes that parking a touring caravan within a house's curtilage does not normally need permission if it is not lived in or stored for sale. (source)

The council lists five conservation areas: Colnbrook, St Bernard's School, St Mary's Church (Langley), Sussex Place/Clifton Road and Upton Park/Upton Village. (source)

The side and front of a red brick house with a white bay window
A red brick house with an integral-style frontage: the front elevation is what a garage conversion changes. Photo: Lester Bonilla / Pexels.

How long does a planning decision take in Slough?

Eight weeks is the statutory period for a householder application. Of the 261 householder planning applications Slough decided from 1 July 2025 to 30 June 2026, excluding prior approvals, 189 (72.4%) were decided within eight weeks.

  • Householder pre-application advice (fees in effect from 1 April 2025): £124 for a desktop checklist response, £185 for a full written assessment, £247.50 with a meeting. (source)
  • The council aims to answer a householder desktop assessment within 10 working days and written householder advice within 15 working days; initial meetings are held by video call. (source)

Design guidance: Residential Extension Guidelines SPD. Approved for adoption by the Planning Committee on 11 January 2010; the council says householders had begun applying for larger and more dominant extensions.

Other local costs and documents in Slough

  • Applications not made through an online service, or sent by email or post, carry an extra service charge. (source)
  • The development plan is the Core Strategy (2008), the saved Local Plan (2004) policies, the Site Allocations DPD and the Minerals and Waste Local Plan; a new Local Plan is in preparation. (source)

Planning and building regulations drawings in Slough

The same published prices apply in Slough as everywhere we work.

Where your work is permitted development, a certificate of lawfulness starts at £950. Not sure which applies? Read do I need planning permission? first.

Neighbouring councils

Slough shares a boundary with three council areas where we publish the same council data. Each has its own approval rate, validation checklist and Article 4 areas, so check which council your address falls under before relying on any one page.

Council facts checked 14 October 2026.

Answers

Slough planning questions

What is Slough Borough Council's householder approval rate?
Slough Borough Council granted 328 of 405 householder decisions (81%) from 1 July 2025 to 30 June 2026, counting householder planning applications and larger home extension prior approvals together. Across London the same measure was 85.8% (20,556 of 23,967). Source: MHCLG live table PS2, district planning application statistics.
How long does Slough Borough Council take to decide a householder application?
The statutory period is eight weeks. Of the 261 householder planning applications Slough decided from 1 July 2025 to 30 June 2026, excluding prior approvals, 189 (72.4%) were decided within eight weeks. Source: MHCLG live table PS2, district planning application statistics. Validation comes first, and an application missing an item on the council's local list does not start the clock.
How much are planning drawings in Slough?
£895 for the complete service, the same as in London, with Slough Borough Council's householder fee of £548 paid separately to the council. See the price list.

Start with £150

Your fixed fee is already on this page.

Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.

01
Measured surveyWithin five working days
£150
02
Existing drawingsThe building as it stands
£200
03
Proposed drawingsYour scheme, revised until right
£250
04
Planning application packForms, statements, OS plans
£150
05
Submission and agent servicePortal submission, queries handled
£145
Total, planning application£895