A row of white-painted London mews houses with blue doors, iron stair rails and window boxes along a cobbled street
A row of white-painted London mews houses with blue doors, iron stair rails and window boxes along a cobbled street
Photo: AXP Photography / Pexels

Planning drawings

What Are the Rules for Extending a Mews House in London?

Most London mews houses sit in conservation areas, many have lost permitted development rights, and councils protect the even parapet line. What Westminster's mews guide says about mansards, garage doors and façades, and how to check your own mews before you design.

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Photo: AXP Photography / Pexels

Plan on needing planning permission. A London mews house is a former stable and coach house, built small and low on a narrow back street, and that is exactly what councils protect. Most mews are in conservation areas, many have had permitted development rights removed, and a typical mews house has a courtyard only a few metres deep, if any, so the rear extension allowances that a terraced house uses do not help. The real rules are the council's design policies, and the one written specifically for mews is Westminster's.

On this page

What does Westminster's mews guide say?

Westminster publishes Mews: A Guide to Alterations on its website. It is an electronic copy of guidance written against the old Unitary Development Plan, and its own cover note says the policy references have not been updated; Westminster's current plan is the City Plan 2019-2040 (2026), adopted on 21 January 2026 (Westminster planning policies). The design advice still describes how officers look at a mews, and other boroughs with mews, Kensington and Chelsea and Camden among them, apply similar thinking through their conservation area appraisals.

The guide's starting points (Westminster mews guide):

  • planning permission is needed for most alterations to the outside of a mews building, apart from routine repair (paragraph 5.1);
  • most of the city's mews are in conservation areas, where removing or enlarging door and window openings also needs consent (paragraph 5.3);
  • if the house is listed, listed building consent is needed for any work affecting its character, and only very limited change is likely (paragraph 5.2).

Can I add a storey to a mews house?

Sometimes, and it depends on your neighbours' roofs. The guide says permission is required in all cases where an additional floor raises the roof line, and for any alteration to a roof in a conservation area, including rooflights and dormers (paragraph 6.1). Then it splits mews into two kinds:

  • Mews with few or no roof extensions. The council may decide an extension would harm the mews and refuse it. Ennismore Gardens Mews in SW7 is named as one where roof extensions will not normally be permitted (paragraph 6.2).
  • Mews that already have several. Extensions should normally be a mansard, flat-topped or double-pitched to match those already there, covered in natural slate with timber dormers clad in lead (paragraph 6.3).

The parapet line is the fixed point. Mews façades are sheer walls front and rear at a common height, and the guide says the parapet line is important to the street scene and should not be disturbed (paragraph 6.5). A mansard sits behind it; it does not raise the wall.

Step by step: 1. Check; 2. Count; 3. Survey; 4. Draw; 5. Apply1CheckConservation area, listing, Article 4and old permissions on your mews.2CountWhich houses in the mews already haveroof extensions, and of what form.3SurveyMeasure the house, the roof and theparapet heights either side.4DrawA scheme that keeps the parapet andmatches the mews pattern.5ApplyPlanning application with a heritagestatement where needed.
Step by step

There is a practical trap too. A new top floor may need a secondary means of escape, and external escape stairs are not normally acceptable, so plan an internal escape route early (paragraph 6.6). Tanks and plant must sit inside the roof profile (paragraph 6.7).

Close-up of an old stucco facade with two tall red-framed windows, carved floral relief between them and cables strung across the front
Carved and framed detail like this is what a heritage statement describes and protects. Credit: Sami TÜRK / Pexels (Pexels License). View full-size image (new tab).

Can I convert the mews garage into a room?

Often, but the front changes, and that is what the council looks at. Replacing garage doors with glazing, a front door and windows alters the elevation of a building in a conservation area, so it needs permission. The guide's illustrations show replacement doors that keep the coach-house look: timber, proportions that echo the old carriage opening, and the visual difference between the ground floor and the floor above kept (section 7). The guide also notes that where the ground floor is in a separate use, such as a garage let separately, making the whole building one dwelling needs planning permission (paragraph 5.1).

Can I extend at the back or dig down?

Usually only a little at the back. Many mews houses back directly onto the gardens of the main houses they once served, so any rear addition is judged on the light and outlook of those houses. Basements are controlled by each borough's own basement policy, and in central London boroughs those policies are detailed; they need structural and hydrological reports that are specialists' work.

How do I check the rules for my own mews?

Four steps before you pay for design:

  1. Find your conservation area on the council's map and read its appraisal; many describe each mews and its roofline.
  2. Check for an Article 4 direction and for conditions on old permissions. Many mews conversions were granted with conditions that removed permitted development rights, so a past decision notice may already answer the question.
  3. Walk the mews and count the roofs. How many houses have mansards, of what form, and how high? That is the pattern your scheme must follow.
  4. Search the register for recent decisions in the mews, and read the outcome as well as the drawings.

An illustrative example, not a real job: an owner of a two-storey mews house in a Westminster conservation area wants a third bedroom. Six of the eleven houses in the mews have flat-topped mansards behind the parapet. The scheme copies that form, in slate with two lead dormers lined up on the first-floor windows, an internal stair continuing up, and the parapet left untouched. A heritage statement explains the fit with the mews.

Question 1 of up to 4

What type of property is it?

Property
Not answered yet
Area
Not answered yet
Work
Not answered yet
Route
Not answered yet
A sketch of your answers, not to scale and not a drawing of your house.

The checker gives a first view of the permitted development position. For most mews houses it will point to an application; that is the honest answer, not a sales one.

What do we charge?

Our complete planning drawing service is £645 drawings + £250 survey (£895 total), with the measured survey included, covering existing and proposed drawings, a street elevation, the form, location and block plans, submission and officer queries. Where the council asks for a heritage statement, ours is from £565. See the Westminster, Kensington and Chelsea and Camden pages for each council's local detail. If your mews plot has room for a new building rather than an extension, read can I build a new house in my back garden.

Work out your fee

FFP-01 · Rev A
Our fixed fee£895
Council fee, paid to your council£548
Our fee + council fee£1,443
CoverageAll 33 boroughs

Householder application fee, paid to your council at submission.

Prices include one measured survey of a house of up to two storeys (£250). A flat or maisonette is £50 less; a house of three storeys or more is £50 more. One survey covers every service on the same job.

Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).

Get this fee in writing

or email hello@fixedfeeplans.co.uk

No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.

Starts at£250
Boroughs33/33
Stages5

Frequently asked questions

Do mews houses have permitted development rights? Some do, but many lose them to conservation area rules, Article 4 directions or conditions on past permissions. Check the house's planning history first.

Will the council allow a mansard on my mews house? It depends on the mews. Where several already exist, a matching mansard is the usual answer; where the roofline is unbroken, it may be refused.

Can I raise the parapet to get more headroom? Councils treat the parapet line as part of the street scene, and Westminster's guide says it should not be disturbed. Design behind it.

Do I need consent to paint the brickwork? Painting brick that has not been painted is a change to appearance and Westminster's guide counts it among undesirable alterations. Ask the council first in a conservation area.

Is my mews house listed? Some are. Search the National Heritage List for England; if listed, listed building consent applies inside and out.

A navy blue painted brick house with a white sash window holding a flower box, ivy climbing beside it and a white front door

Fixed fee, in writing

Complete planning drawing service: £645 drawings + £250 survey (£895 total)

The fee is published and confirmed in writing before any work starts. Council fees are passed through at cost, never marked up.

Get my fixed fee

Photo: Kévin et Laurianne Langlais / Pexels

Floor plan drawings, pencil sketches of a house, a scale rule and a protractor spread across a desk
Photo: Tima Miroshnichenko / Pexels

The figures, with their sources

Complete planning drawing service: the fee, fixed

£895

£645 drawings + £250 survey (£895 total)

Council fee £548 on top, paid to your council, never to us. A fixed fee, confirmed in writing before any work starts.

Prices include one measured survey of a house of up to two storeys (£250). A flat or maisonette is £50 less; a house of three storeys or more is £50 more. One survey covers every service on the same job.

  1. Measured survey£250
  2. Existing drawings£175
  3. Proposed drawings£225
  4. Planning application pack£125
  5. Submission and agent service£120
Get my fixed fee

What you get

  • A laser measured survey of the mews house, including the roof and parapet
  • Existing and proposed plans, elevations and a section through the roof
  • A street elevation showing the neighbours' roofs and parapet line
  • The application form, location and block plans
  • Submission to the council and officer queries handled

Ask for your fixed fee

Send the postcode and a line about the project. Photos or old plans help, and the fee comes back in writing.

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Two hands holding a printed floor plan over a desk of drawings, with a pen and notebook beside it
Photo: Tima Miroshnichenko / Pexels

Keep reading

Related posts and guides

A person seen from above placing small white model buildings on a hand-drawn site plan, beside a case of compasses and pencils
Planning drawings£245

Can I Build a New House in My Back Garden in London?

Sometimes. A new house in a London back garden needs full planning permission, and since August 2026 the NPPF gives substantial weight to homes on existing plots if they stay within set footprint and garden limits. What decides it: access, neighbours, the street and your borough's backland policy.

5 min readComing soon
A terrace of Victorian red brick houses in London with ornate gables and white-framed sash windows against a blue sky
Conversions£895

Can I Convert Two Flats Back Into One House in London?

Turning two London flats back into a single house usually needs planning permission, and the argument is about losing a home. What the London Plan says, how a 2026 Lambeth appeal was decided, and what to put in the application.

6 min readComing soon
A bunch of keys hanging in front of a blurred small wooden house model
Planning drawings£895

Can I Extend a Flat in London?

Yes, but never under permitted development: a London flat needs a full planning application, the freeholder's consent under the lease, and the right ownership certificate. What each step involves and costs.

7 min readPublished November 2026
A person writing in a diary with a gold pen while typing on a laptop at a glass desk
Planning drawings£895

How Do I Get Drawings for Planning Permission Online in London?

How to get drawings for planning permission in London without leaving your laptop: which steps run online, the one visit that usually remains, and what you sign.

7 min readUpdated November 2026
A hand marking up printed charts with a red marker, beside a notepad, a pen and part of a technical drawing
Planning drawings£895

Can I Get Planning for a House With a Previous Refusal in London?

What an earlier refusal or dismissed appeal on a London house means for your own application: how to find and read the history, what counts as a real change, and when a council can refuse to decide.

7 min readPublished November 2026
A tall stack of office papers held with coloured clips on a wooden desk, a pair of glasses and a keyboard in front
Planning drawings£895

Can Someone Take Over My Unfinished Planning Drawings in London?

Your designer has stopped answering, or you have fallen out, and the planning drawings are half done. Who owns them, when you can let someone else carry on, what files to ask for, and when a fresh survey is cheaper than trusting the old one.

5 min readPublished November 2026
Guide · Permitted development

Do I need planning permission? Permitted development rights explained

The GPDO rights that let you extend without an application, and the conservation area and Article 4 traps that remove them.

12 min read
Guide · Certificates

Certificate of Lawfulness: Section 191, Section 192 and Immunity Periods

Section 191 vs 192, the evidence councils want, and the 10-year rule since April 2024.

7 min read
Get a fixed quote £895
Get my fixed fee