Lawful development certificate drawings in London are a set of six: a location plan edged red, a site or block plan, existing and proposed floor plans, elevations, a roof plan and a section. Each one must carry the dimensions that prove a permitted development limit, because the officer measures the drawings against the Order and nothing else.
On this page
- Which lawful development certificate drawings prove which limit?
- Why is a certificate drawing stricter than a planning drawing?
- How is the loft volume shown?
- Which London houses cannot use a loft certificate?
- What does a certificate for work already built need?
- Does the set need a fresh survey?
- How long does the council take to decide?
- What comes after the certificate?
- Frequently asked questions
A lawful development certificate is a council's binding statement that a use or building work is lawful: under section 192 for work you propose, or section 191 for work already done. The law asks for less than the councils do. Article 39(2) of the Development Management Procedure Order 2015 requires "a plan identifying the land", drawn to an identified scale and showing north. It also asks for "such evidence verifying the information included in the application as the applicant can provide" (DMPO 2015, article 39). London councils' local lists turn that evidence into scaled drawings. Our certificate of lawfulness service is from £545 drawings + £250 survey (£795 total) with the survey included, and the council fee for a proposed-work certificate is £274.
Which lawful development certificate drawings prove which limit?
Each drawing in a certificate set exists to prove one or more numbers in the General Permitted Development Order 2015. The table pairs each sheet with the measurement an officer will scale from it. A sheet that carries no dimension for its limit is the one that draws a further-information letter.
| Sheet | Scale we draw it at | The number it must show |
|---|---|---|
| Location plan | 1:1250 or 1:2500 | The land, edged red, with north (DMPO art 39(2)(a)) |
| Site or block plan | 1:200 or 1:500 | Distance from the work to every boundary; garden area covered |
| Floor plans, existing and proposed | 1:50 or 1:100 | Depth beyond the original rear wall; width against the side walls |
| Elevations, existing and proposed | 1:50 or 1:100 | Height, and eaves height within 2 metres of a boundary |
| Roof plan, existing and proposed | 1:50 or 1:100 | Dormer position, eaves set-back, nothing above the ridge |
| Section | 1:50 | Heights from the highest adjoining ground; added roof volume |
The plan and elevation scales match the City of London's checklist. It asks for drawings at 1:50 or 1:100 that "clearly define the precise area of land, building or operations". It also wants the site edged red and other land you own edged blue (City of London LDC checklist). Every sheet needs a scale bar and its paper size, so the officer can measure from a printout.

Why is a certificate drawing stricter than a planning drawing?
A certificate drawing is stricter because the officer cannot weigh design at all. Section 192 of the Town and Country Planning Act 1990 sets a single test: would the work "be lawful if instituted or begun at the time of the application"? If the information shows it would, the council must issue the certificate, and it refuses "in any other case" (TCPA 1990, s192). The government's guidance adds that "planning merits are not relevant" and that an application "needs to describe precisely what is being applied for" (MHCLG guidance, paragraphs 005 and 009).
So a 3 metre single-storey rear extension on a terrace has to be drawn as 3 metres from the rear wall of the original house, not from a later back addition. Class A.1(f) caps a single-storey rear extension at 3 metres on a house that is not detached and 4 metres on one that is. Class A.1(i) adds that any part within 2 metres of a boundary, the party wall included, may not have eaves above 3 metres (GPDO 2015, Schedule 2, Part 1, Class A). Both numbers belong on the drawings as dimensions.
How is the loft volume shown?
The loft volume is shown as a separate calculation sheet that breaks the new roof space into simple shapes. Class B.1(d) allows the roof space to grow by no more than 40 cubic metres on a terrace house and 50 cubic metres on any other house, counting earlier roof additions (GPDO 2015, Class B).
Consider a mid-terrace house with a rear box dormer (an illustration, not a real job). The dormer is 4.8 metres wide, rises 2.3 metres above the floor at its face and reaches 3.4 metres back to the ridge. As a wedge, its added volume is 4.8 × 2.3 × 3.4 ÷ 2, or about 18.8 cubic metres. Two roof windows add nothing. The total sits under the 40 cubic metre terrace limit with room to spare, and the sheet shows each step so the officer can check it.
The roof plan also has to show the dormer set back at least 0.2 metres from the eaves, measured along the roof slope, "so far as practicable" (Class B.2(b)). Hip-to-gable work is exempt from that set-back.
Which London houses cannot use a loft certificate?
A house on article 2(3) land cannot use Class B at all: paragraph B.1(f) removes roof enlargement rights there. In London, article 2(3) land covers conservation areas and World Heritage Sites (GPDO 2015, Schedule 1, Part 1). Westminster has 56 and Islington 42, by the councils' own counts (Westminster, Islington). On those houses, a dormer needs a planning application, not a certificate.
Class A survives on article 2(3) land with three extra limits under A.2: no cladding, no side extension and no rear extension of more than one storey. Listing does not remove Class A or B rights, but listed building consent is a separate application. Check the house first in how to check your permitted development rights.
What does a certificate for work already built need?
A certificate for existing work under section 191 needs drawings of what stands now and dated evidence of when it was finished. Section 191(2) treats operations as lawful once "no enforcement action may then be taken" (TCPA 1990, s191).
The time limit depends on the date. Building work substantially completed before 25 April 2024 became immune after four years; work completed after that date needs ten (SI 2024/452, regulation 5). The guidance says the evidence must be "sufficiently precise and unambiguous to justify the grant of a certificate" on the balance of probability (MHCLG, paragraph 006).
Useful evidence includes builders' invoices, dated photographs, a building control completion certificate, council tax records and a statutory declaration. Our lawful development certificate guide covers the time limits in more depth.
Does the set need a fresh survey?
A proposed-work set needs a measured survey because every limit is measured from the house as it stands. A set traced from an estate agent's plan rarely carries roof pitch, ridge height or boundary offsets, and those are the figures the volume and eaves tests depend on. Our fee includes the laser survey, carried out within 1 to 2 working days of booking.
How long does the council take to decide?
The council has eight weeks, starting the day after it receives the application, unless you agree a longer period in writing (DMPO article 39(10)). Before deciding, it can ask in writing for more information (article 39(9)). A refusal must give "full reasons" and name the right of appeal under section 195 (article 39(13)).
What comes after the certificate?
A certificate settles planning only. Building regulations approval is a separate step with construction drawings: see what planning drawings include if the project turns out to need permission, and the certificate cost breakdown for every fee in one place.
Work out your fee
FFP-01 · Rev AHalf the equivalent planning fee for a proposed use certificate.
Prices include one measured survey of a house of up to two storeys (£250). A flat or maisonette is £50 less; a house of three storeys or more is £50 more. One survey covers every service on the same job.
Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).
Get this fee in writingor email hello@fixedfeeplans.co.uk
No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.
Frequently asked questions
Do I need building regulations drawings for a lawful development certificate? No. The certificate is a planning decision. Building regulations approval is separate and needs construction drawings later, which we price on the building regulations drawings page.
Can I reuse drawings from a refused planning application? Only if they are drawn from a survey and dimensioned to each limit. Planning drawings are often drawn to show design, so they usually need dimensions adding before an officer can test them.
Will the council let me correct a drawing? It may ask for more information under article 39(9), but it does not have to. The guidance allows a refusal where the description is not precise, and a refusal means a new application and a new fee.
Do I need a design and access statement? No. Article 39 of the DMPO sets out what a certificate application must include, and a design and access statement is not on that list. A short covering letter naming the Class relied on helps the officer.
If the application goes through the Planning Portal, the Portal adds its own service charge: nothing, £99 or £149 including VAT, depending on the application type and complexity, paid to the Portal at submission and not normally refunded with a council fee (Ashford Borough Council, Planning Portal service charges, 11 September 2026). It is not ours and not the council's. Other submission routes exist; where your council accepts one without a charge, we can use it.