Planning drawings

Can I Get Planning Drawings Amended After Council Comments in London?

When a London planning officer asks for changes mid-application, you can usually send amended drawings without starting again. How that works, when it does not, and the routes and fees once permission is granted.

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Photo: Derek Harper / Wikimedia Commons, CC BY-SA 2.0

Yes, in most cases. While a London application is still undecided, the officer can accept amended drawings without a new application or a new fee: the government's guidance says it is at the council's discretion whether to accept changes before it decides (MHCLG, paragraph 061). The limit is size. If the change would materially alter the proposal, the council should ask for a new application instead. Once permission is granted, the routes change to a non-material amendment or a section 73 application, each with a small council fee. Our revisions are from £285.

On this page

The usual moment is an email from the case officer, often around week five or six of the eight: "I have concerns about the depth of the extension; I would be willing to consider amended plans by Friday." What you do in the next few days decides whether you get a permission or a refusal.

What can I change before the decision?

Changes that respond to the officer's concern without turning the scheme into something else. Typical London examples:

  • Pulling a rear extension back 500mm from the boundary with the neighbour's kitchen window.
  • Lowering a parapet wall, or setting a dormer back from the eaves and in from the party wall.
  • Swapping uPVC windows for timber sashes on a conservation area street.
  • Reducing a second-floor rear addition to a single storey.

The guidance also lets the council decide whether the change needs neighbours to be consulted again (paragraph 061). A smaller scheme often does not; a different one usually does, and that adds time.

A hand marking up printed charts with a red marker, beside a notepad, a pen and part of a technical drawing
An amendment starts with marking up what the approved scheme shows and what you want to change. Photo: RDNE Stock project / Pexels (Pexels License).

When will the council refuse to take amendments?

Three situations come up.

The change is material. Adding a storey, moving the extension to another side of the house, or changing a house into flats mid-application is not an amendment, and the guidance says a new application should be submitted (paragraph 061).

There is no time. The council has 8 weeks for a householder application unless a longer period is agreed in writing (MHCLG, paragraph 001). Some London teams decide at week eight on what they have rather than wait. If you need longer, say so and agree an extension of time; the guidance expects councils to ask for one where more time is genuinely needed (paragraph 003).

The borough's own practice. Because acceptance is discretionary, practice differs between London councils and between officers, including how many rounds of changes they will take. Read the officer's email for the deadline and the limit, and if it is unclear, ask.

Speed varies widely. Camden decided 129 of 212 householder applications (excluding prior approvals) within 8 weeks in the year to June 2026, while Bexley decided 755 of 758 (MHCLG PS2). In a slower borough an amendment round is more common; in a fast one the window is narrow.

Step by step: 1. Read the comments; 2. Agree the time; 3. Redraw; 4. Send; 5. Decide1Read the commentsWhat the officer wants changed, and bywhen.2Agree the timeAn extension of time in writing if the 8weeks is close.3RedrawAffected sheets revised, changesclouded, revision letters added.4SendRevised drawings and a note to theofficer through the application.5DecideThe officer decides on the amendedscheme.
Step by step

How should amended drawings be sent?

As full revised sheets, not marked-up PDFs. Each affected drawing gets a new revision letter, the changes clouded, and a revision note saying what changed. A short covering note lists every sheet that has changed and links each change to the officer's comment. Unchanged sheets stay at their old revision so the officer can see at a glance what is new.

Speed matters more than polish here. A correct, clear revision sent in three days beats a perfect one sent after the decision. When we drew the original set, we already have the survey and the model, so a typical revision of a few sheets is quick to turn round.

What do officers in London most often ask to change?

The comments follow the same concerns that drive refusals, which is why answering them matters. On London extensions and lofts they tend to be:

  • Depth and height beside a neighbour. On a terrace with closet wings, the officer checks the effect on the next-door rear window. Common fixes are a shallower extension on the boundary side, a lower eaves line, or a sloping roof edge in place of a flat parapet.
  • Dormer size. Officers often ask for a dormer set back from the eaves, set in from the party wall and kept below the ridge, so that the original roof still reads around it.
  • Materials and windows. In a conservation area, the request is often for brick to match, timber in place of uPVC, or a window pattern that lines up with the floors below.
  • Missing or unclear drawings. A neighbour's window not shown, a section missing, or a roof plan that does not match the elevations. These are the easiest to fix and the most avoidable.

Ask what the officer would accept, then draw exactly that. A revision that half-answers a comment often leads to a refusal anyway.

What if permission has already been granted?

The routes are different, and they are covered in detail in our amending planning permission cost post. In short:

Route When Council fee (householder)
Amended drawings before the decision Officer asks, change not material None
Non-material amendment (section 96A) Small change after permission £46 (£309 in any other case)
Section 73 variation Change to a condition, such as the approved plans £89
New application Material change £548

Fees are from the 1 April 2026 fee table. A non-material amendment is normally decided within 28 days (MHCLG, paragraph 007).

Cost breakdown: Our fee £285 paid to us£285Our fee, £285, paid to usFrom £285 in all
Where the money goes, from our published prices. The council's amendment fee is paid to your council.

What if I do nothing and the council refuses?

Then the amendment route closes, and you are choosing between an appeal and a fresh application with the full fee again, because the free resubmission ended in December 2023. Our refused application post sets out that choice. Answering the officer's comments while the application is live is almost always cheaper.

Frequently asked questions

Is there a fee for sending amended plans before the decision? No council fee. The application fee you paid covers the amended scheme. Our fee for the revision depends on how many sheets change; it starts at £285 for drawings we prepared.

Can I amend plans another firm drew? Yes, but we first check the drawings against the house. If they were not drawn from a measured survey, we may need one before revising, and we tell you that before you commit.

Should I withdraw and resubmit instead? Only if the change is material or the officer advises it. Withdrawing means paying the council fee again on the new application.

Will the officer tell me exactly what to change? Often, but not always. Where the comment is vague, we ask the officer what would be acceptable before redrawing, so the revision answers the concern the first time.

If the application goes through the Planning Portal, the Portal adds its own service charge: nothing, £99 or £149 including VAT, depending on the application type and complexity, paid to the Portal at submission and not normally refunded with a council fee (Ashford Borough Council, Planning Portal service charges, 11 September 2026). It is not ours and not the council's. Other submission routes exist; where your council accepts one without a charge, we can use it.

A woman and a man in white hard hats looking at a large printed plan in a bright empty room

Fixed fee, in writing

Planning amendment: from £285

The fee is published and confirmed in writing before any work starts. Council fees are passed through at cost, never marked up.

Get my fixed fee

Photo: Thirdman / Pexels

The figures, with their sources

Planning amendment: the fee, fixed

from £285

from £285

The council's amendment fee is paid to your council A fixed fee, confirmed in writing before any work starts.

Get my fixed fee

What you get

  • A reading of the officer's email or comments, point by point
  • Revised drawings with every change clouded and the revision noted
  • A short covering note listing what changed and why
  • Upload to the live application, or a fresh route where the change is material
  • Advice on whether to agree an extension of time

Ask for your fixed fee

Send the postcode and a line about the project. Photos or old plans help, and the fee comes back in writing.

Ask for your fixed fee in writing

Name and email are required. Everything else helps us price it, but is optional.

Your enquiry goes to us and nowhere else. It is never syndicated or sold. See our privacy notice.

Get a fixed quote from £285
Get my fixed fee