

Flood risk assessment · London Borough of Lambeth
Flood risk assessment in Lambeth, from £375 fixed
Lambeth's local list asks for a flood risk assessment with every proposal in Flood Zones 2 and 3, and in Flood Zone 1 wherever its own flood studies show surface water, groundwater or sewer flooding. Surface water risk can also bring a sequential test, so we check your address on both maps first.
or email hello@fixedfeeplans.co.uk
No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.
Photo: Chris Whippet / Wikimedia Commons, CC BY-SA 2.0
Fixed fee, in writing
Tell us about your project
Send the postcode and what you want to build, and add photos or old plans if you have them. We reply with the fee in writing and the payment stages set out in full.

What Lambeth Council asks of a flood risk assessment
From the council's Local Information Requirements (the Local List) 2024, item 34, under Local Plan Policy EN5 (adopted 2024 edition, published December 2025, read 29 October 2026).
- A site-specific flood risk assessment must be submitted with all development proposals in Flood Zones 2, 3a and 3b, as a requirement of Policy EN5 of the Lambeth Local Plan 2021. (source, checked 29 October 2026)
- In Flood Zone 1, one is needed for residential sites over 0.5 hectare or with 10 or more homes, sites under 1 hectare with a critical drainage problem, and other proposals with evidence of risk from surface run-off, groundwater or sewer flooding in the Lambeth SFRA or Local Flood Risk Management Strategy. (source, checked 29 October 2026)
- Sequential testing is required for sites at high or medium risk of surface water flooding on the Environment Agency's maps, and for developments in Flood Zones 2, 3a and 3b, in line with Annex 5 of the Local Plan. (source, checked 29 October 2026)
- The assessment should show how flood risk will be managed over the development's lifetime, with an allowance for climate change and regard to the vulnerability of its users. (source, checked 29 October 2026)
What Lambeth flood risk assessment drawings have to show
In Lambeth the question is often not the Thames at all but surface water, groundwater or sewer flooding recorded in the council's own flood studies, which can bring an assessment in Flood Zone 1. We check the flood zone and those studies for your address before we write a word.
The assessment then gives the flood level with climate change, the finished floor level and the measures for the extension, and it flags early where surface water risk means the council will expect a sequential test.
Lambeth: 595 householder decisions

What it costs in Lambeth
- Flood risk assessment: from £375.
Flood risk assessment across London · Lambeth planning rules · every price

Flood risk assessment · Lambeth
What happens next in Lambeth
We check your address on every map the council uses, take the flood level with climate change, set the floor level and resilience measures, and mark them on the drawings.
Photo: Helena Jankovičová Kováčová / Pexels
Answers
Lambeth flood risk assessment questions
When does Lambeth require a flood risk assessment?
Will Lambeth ask for a sequential test on my extension?
Start with £150
Your fixed fee is already on this page.
Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.