

Planning drawings · London Borough of Richmond upon Thames
Planning drawings in Richmond upon Thames, £795 fixed
Richmond's February 2026 validation checklist asks for details most boroughs leave out: demolition plans with photographs, 1:20 joinery drawings in conservation areas, revision control by drawing number and refuse storage on the plans. We draw to it, so your application is valid when it is submitted.
Householder application fee, paid to your council at submission.
Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).
Get this fee in writingor email hello@fixedfeeplans.co.uk
No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.
Fixed fee, in writing
Tell us about your project
Send the postcode and what you want to build, and add photos or old plans if you have them. We reply with the fee in writing and the payment stages set out in full.

What Richmond upon Thames Council asks of a householder planning application
From the council's Local Validation Checklist for all applications (adopted 19 February 2026).
- Richmond requires a block plan at 1:100, 1:200 or 1:500 showing existing and proposed buildings, adjoining buildings, trees, hard surfacing and boundary treatments, with floor plans and elevations at 1:50 or 1:100 and site sections and levels at the same scales. (source, checked 25 October 2026)
- Roof plans must include plant, lift overruns and green roofs where applicable, and demolition plans must show the parts of the building to be fully or partially removed, with photographs encouraged, especially for historic buildings. (source, checked 25 October 2026)
- For listed buildings, buildings of townscape merit and conservation areas, detailed plans at a scale not less than 1:20 must show new doors, windows, shop fronts, panelling, fireplaces, plaster mouldings and other decorative features. (source, checked 25 October 2026)
- All plans must show key metric dimensions, carry drawing titles, numbers and a full drawing list, and revisions must keep the same drawing numbers with updated title blocks (Rev. A to Rev. B) and a note explaining the change. Refuse and recycling storage must be clearly shown. (source, checked 25 October 2026)
- Where landscaping is proposed above a basement under a garden, including on householder applications, a cross-section must demonstrate at least 1 metre of naturally draining permeable soil and a drainage layer of at least 200mm. (source, checked 25 October 2026)
What Richmond upon Thames householder planning application drawings have to show
Richmond's checklist has habits of its own. Revisions keep the same drawing number with the revision letter stepped up and a note of what changed, so we run a drawing list and revision log from the first issue. Demolition is shown on its own plan with photographs, and the block plan carries the trees, hard surfacing and boundary treatments.
On a listed house, a house of townscape merit or anything in a conservation area, new doors, windows and joinery are drawn at 1:20 or larger, with the mouldings shown. If a basement sits under the garden, the cross-section states the soil depth and drainage layer the council asks for. Refuse and recycling storage is drawn on the plan, not described in a letter.
Richmond upon Thames: 1,302 householder decisions

What it costs in Richmond upon Thames
- Complete planning drawing service: £645 drawings + £150 survey (£795 total), plus £548 to Richmond upon Thames Council.
- Householder application fee, paid to your council at submission.
Planning drawings across London · Richmond upon Thames planning rules · every price
Answers
Richmond upon Thames householder planning application questions
What drawing scales does Richmond ask for?
How does Richmond want revised planning drawings numbered?
Does a garden basement in Richmond need a soil depth shown on the drawings?
Start with £150
Your fixed fee is already on this page.
Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.