

HMO drawings · London Borough of Bexley
HMO drawings in Bexley, from £945 fixed
Bexley has needed planning permission to turn any house into a small HMO since 24 September 2017. Licensing is narrower: beyond mandatory licensing, only Belvedere ward has a selective scheme, running from 13 January 2025 to 12 January 2030, with its own Rent it Right standards.
Householder application fee, paid to your council at submission.
Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).
Get this fee in writingor email hello@fixedfeeplans.co.uk
No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.
Fixed fee, in writing
Tell us about your project
Send the postcode and what you want to build, and add photos or old plans if you have them. We reply with the fee in writing and the payment stages set out in full.

What Bexley Council asks of a HMO conversion
From the council's HMO Article 4 Direction (borough-wide) (adopted 24 September 2017 (in force)).
- Bexley made a borough-wide Article 4 direction, in force since 24 September 2017, removing the right to change a house (C3) into a small HMO (C4) anywhere in the London Borough of Bexley. (source, checked 25 October 2026)
- The council's selective licensing scheme covers Belvedere ward only, operating from 13 January 2025 until 12 January 2030, alongside mandatory HMO licensing. (source, checked 25 October 2026)
- Licensed properties must comply with the council's Rent it Right standards and conditions, licence holders and agents must be fit and proper persons, and they must become accredited within 12 months of the licence being issued. (source, checked 25 October 2026)
What Bexley HMO conversion drawings have to show
Bexley's direction is borough-wide and dates from 2017, so a house-to-HMO change anywhere in the borough starts with a planning application. Our proposed plans show each bedroom with its floor area and occupancy, the shared kitchen, bathrooms and living room, and the bin and cycle storage, set against the existing family layout.
Licensing in Bexley is narrower than in most London boroughs. Outside the mandatory scheme for larger HMOs, a licence is needed only in Belvedere ward, under the selective scheme running to January 2030. If your house is in Belvedere, the drawings are made to the Rent it Right standards as well, so the layout passes both the planning and the licensing checks.
Bexley: 877 householder decisions

What it costs in Bexley
- HMO drawings: from £795 drawings + £150 survey (£945 total), plus £610 to Bexley Council.
- Where a change of use application is required.
HMO drawings across London · Bexley planning rules · every price
Answers
Bexley HMO conversion questions
Do I need planning permission for a small HMO in Bexley?
Does a small HMO in Bexley need a licence?
What are the Bexley Rent it Right standards?
Start with £150
Your fixed fee is already on this page.
Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.