Two Victorian terraced houses on a London street, one painted white and one in yellow stock brick, with bay windows
Floor plan drawings, pencil sketches of a house, a scale rule and a protractor spread across a desk
Photo: Tima Miroshnichenko / Pexels

Planning drawings · Reigate and Banstead Borough Council

Planning drawings in Reigate and Banstead, £895 fixed

Reigate and Banstead asks for street scene drawings at 1:100 or 1:200 where the ridge height changes and, in the Green Belt, the existing and proposed footprint, floorspace and volume. The council says Article 4 directions have been served on most of its conservation areas, controlling external changes such as replacement windows, but it does not list which areas or which rights, so we check your address before we design. A borough-wide direction on small houses in multiple occupation was notified on 30 July 2026; we have not found it confirmed, and if it is it would come into force on 30 July 2027.

Our fee£895
Householder approval (incl. prior approvals)93.5%
Applications decided in 8 wks95.6%
Council fee£548
Get your fixed feeFFP-01 · Rev A
Our fixed fee£895
Council fee, paid to your council£548
Our fee + council fee£1,443
CoverageAll 33 boroughs

Householder application fee, paid to your council at submission.

Plus the Planning Portal's own charge if the application goes through the Portal: up to £149 including VAT, depending on the application type, and some types have none (source).

Get this fee in writing

or email hello@fixedfeeplans.co.uk

No obligation. Nothing is sent until you ask; your enquiry comes to us and nowhere else.

Starts at£150
Boroughs33/33
Stages5

Photo: Huy Phan / Pexels

Planning permission drawings in Reigate and Banstead from Fixed Fee Plans cost £895, survey to submission. Reigate and Banstead Borough Council granted 543 of 581 householder decisions (93.5%) from 1 July 2025 to 30 June 2026, counting householder planning applications and larger home extension prior approvals together. The council's own fee of £548 is paid to the council.

What is the householder approval rate in Reigate and Banstead?

Reigate and Banstead Borough Council granted 543 of 581 householder decisions (93.5%) from 1 July 2025 to 30 June 2026, counting householder planning applications and larger home extension prior approvals together. Across London the same measure was 85.8% (20,556 of 23,967). Source: MHCLG live table PS2, district planning application statistics, 1 July 2025 to 30 June 2026. See the other Surrey councils on the Surrey planning page.

Reigate and Banstead at a glance, householder applications
  • Reigate and Banstead: granted93.5% 543 of 581 granted
  • London: granted85.8% 20,556 of 23,967 granted
  • Reigate and Banstead: decided in 8 weeks95.6% 438 of 458 within 8 weeks
  • London: decided in 8 weeks93.4% 15,451 of 16,549 within 8 weeks

Granted includes larger home extension prior approvals; decided in 8 weeks excludes them. Source: MHCLG live table PS2, district planning application statistics, 1 July 2025 to 30 June 2026.

The tiled roofs and upper floors of brick semi-detached houses in Canterbury, England, with trees behind
Semi-detached houses in Canterbury, England. Photo: angie duong / Pexels.

What does Reigate and Banstead Borough Council need to validate an application?

  • A block plan at 1:200 or 1:500 showing the trees on the site and next door, the extent and type of hard surfacing, and the type and height of boundary walls and fences. (source)
  • Street scene drawings at 1:100 or 1:200 where the ridge height changes, showing the height and outline of the neighbouring houses, their windows and doors, and written dimensions for the gaps between buildings. (source)
  • In the Green Belt, details of the existing and proposed footprint, floorspace and volume. (source)
  • Certificate B, with notice served on the adjoining neighbour, where an extension ties into an attached house; and on Surrey County Council where a new vehicle crossover adjoins the highway. (source)
  • Ecology surveys where protected species may be affected, for example by roof enlargements or the loss of trees, starting with a preliminary ecological appraisal. (source)
  • A heritage statement for work to a listed building or a building in a conservation area, and a CIL form with every householder application. (source)

Article 4 directions in Reigate and Banstead

An Article 4 direction removes permitted development rights, so work that needs no application elsewhere needs one here. Check yours with the permitted development checker.

  • Most conservation areas. The council says Article 4 directions have been served on most conservation areas in the borough, controlling external changes to houses such as replacement windows. (source)
  • Town and local centres (commercial to residential). In force since 13 February 2026: removes the Class M and MA rights to turn ground-floor commercial units into homes in Banstead, Horley, Redhill and Reigate town centres and its local centres. It does not affect extensions. (source)
  • Houses in multiple occupation (proposed, borough-wide). Notified on 30 July 2026, with consultation to 24 September 2026. If confirmed it would come into force on 30 July 2027, so turning a house into a small HMO would need permission. (source)

The national planning data register records 19 conservation areas in the borough, including Reigate Town Centre, Banstead, Kingswood, Walton on the Hill, Merstham Village and Wray Common. (source)

The side and front of a red brick house with a white bay window
A red brick house with an integral-style frontage: the front elevation is what a garage conversion changes. Photo: Lester Bonilla / Pexels.

How long does a planning decision take in Reigate and Banstead?

Eight weeks is the statutory period for a householder application. Of the 458 householder planning applications Reigate and Banstead decided from 1 July 2025 to 30 June 2026, excluding prior approvals, 438 (95.6%) were decided within eight weeks.

  • From 1 April 2026, written householder pre-application advice costs £114, and a meeting with written advice £171; a case officer site visit is £114 extra. (source)
  • Officers decide about 90% of applications; the 10% that go to Planning Committee are generally larger schemes such as new housing estates. (source)

Design guidance: Householder Extensions and Alterations SPG (March 2004). Single-storey rear extensions along a boundary deeper than 3m for a terraced house, 3.3m for a semi-detached and 3.5m for a detached house are likely to be unacceptable; it also sets a 45-degree test for overshadowing.

Other local costs and documents in Reigate and Banstead

  • The council has started a new Local Plan to 2044, with a scoping consultation open until 5pm on 26 October 2026; once adopted it will replace the 2014 Core Strategy and the 2019 Development Management Plan. (source)
  • Alongside the 2004 householder guidance, the council lists a Local Character and Distinctiveness Design Guide SPD (2021) and a Climate Change and Sustainable Construction SPD (2021). (source)

Planning and building regulations drawings in Reigate and Banstead

The same published prices apply in Reigate and Banstead as everywhere we work.

Where your work is permitted development, a certificate of lawfulness starts at £950. Not sure which applies? Read do I need planning permission? first.

Neighbouring councils

Reigate and Banstead shares a boundary with five council areas where we publish the same council data. Each has its own approval rate, validation checklist and Article 4 areas, so check which council your address falls under before relying on any one page.

Council facts checked 14 October 2026.

Answers

Reigate and Banstead planning questions

What is Reigate and Banstead Borough Council's householder approval rate?
Reigate and Banstead Borough Council granted 543 of 581 householder decisions (93.5%) from 1 July 2025 to 30 June 2026, counting householder planning applications and larger home extension prior approvals together. Across London the same measure was 85.8% (20,556 of 23,967). Source: MHCLG live table PS2, district planning application statistics.
How long does Reigate and Banstead Borough Council take to decide a householder application?
The statutory period is eight weeks. Of the 458 householder planning applications Reigate and Banstead decided from 1 July 2025 to 30 June 2026, excluding prior approvals, 438 (95.6%) were decided within eight weeks. Source: MHCLG live table PS2, district planning application statistics. Validation comes first, and an application missing an item on the council's local list does not start the clock.
How much are planning drawings in Reigate and Banstead?
£895 for the complete service, the same as in London, with Reigate and Banstead Borough Council's householder fee of £548 paid separately to the council. See the price list.

Start with £150

Your fixed fee is already on this page.

Tell us the postcode and what you want to build. We confirm the fee in writing and book the survey.

01
Measured surveyWithin five working days
£150
02
Existing drawingsThe building as it stands
£200
03
Proposed drawingsYour scheme, revised until right
£250
04
Planning application packForms, statements, OS plans
£150
05
Submission and agent servicePortal submission, queries handled
£145
Total, planning application£895